Ian Smith

1,367 views

Now that I have completed the baseboards, a start can be made on the track work...

 

However, as preparation is everything I first wanted to put down a raised track bed. This is formed from some 1/32" bass wood sheet which was fixed to the baseboard top with PVA, and weighted while it dried. This was done in relatively small sections by transposing the Templot trackbed onto the sheets before cutting out ready to be affixed - I had included the Trackbed Edges on the print out from Templot.

 

Once all of the trackbed was in place and dry, it was rubbed over with some 280 grade wet and dry fixed to a flat wood block to ensure that all was level.

 

Because I didn't want to stick the Templot plan to the baseboards or the trackbed, it was necessary to transpose the track plan from paper onto the layed and levelled track bed. This was achieved by cutting through the rails on the Templot plan every 20 to 40mm, then "dotting" the rails in place on the track bed before finally joining the dots :

blogentry-12089-0-07492600-1403632365_thumb.jpg

Templot plan with a myriad of little holes in it!

 

blogentry-12089-0-84363000-1403632379_thumb.jpg

Rails "dotted" in place on the track bed

 

blogentry-12089-0-60013000-1403632396_thumb.jpg

Rails drawn in by joining the dots.

 

blogentry-12089-0-42289700-1403632411_thumb.jpg

Transposition complete (towards Exeter)

 

blogentry-12089-0-15823700-1403632424_thumb.jpg

Transposition complete (towards Plymouth)

 

Obviously, it only makes sense to do the above operation if you only need to know where the rails should go and don't need the sleeper positions!!! Luckily because I'm going to be laying "Baulks" rather than Sleepers I can. :sungum:

However, in order to be able to put the Baulks in place consistently I do need a jig of some sort, so out came the lathe, and in an hour or so I'd made a couple of roller gauges to allow me to just that :

blogentry-12089-0-97458300-1403632678_thumb.jpg

 

The Baulks are actually HO gauge copper clad sleeper strip which at 2.4mm wide is about right for a 2mm scale timber baulk (At least for the plain track work - Although I need to produce something somewhat wider for the switch baulks and the crossing baulks (not an issue as I have some PCB strip that is the same depth as the HO sleeper strips but is too wide at the minute so needs milling down to size).

 

Regards,

Ian

  • Like 9

5 Comments


Recommended Comments

  • RMweb Gold

Looks great Ian! Lovely to see the trackwork taking shape at last. Isn't it satisfying when all the planing finally allows something tangible to be constructed!

 

Dave

Link to comment

Looks great Ian! Lovely to see the trackwork taking shape at last. Isn't it satisfying when all the planing finally allows something tangible to be constructed!

Dave

Dave,

It's really satisfying to know that I've completed all of the ground work so to speak so that I can finally get on with what I consider to be the layout proper!  Hopefully, the care that I've taken up front (and the patience I've had to exercise to not jump straight in) will pay dividends in the long run.

 

 

Your baulks look too close together. Mr Brunel would not approve  ;)

Andy,

If I put them any further apart my saddle tank would fall down the middle :-)

 

 

Really neat work as usual Ian. 

 

Jerry

Jerry,

Thank you.  The problem is that the rest of the 2mm brigade have set a very high target :-)

 

Ian

Link to comment

If I put them any further apart my saddle tank would fall down the middle :-)

 

Mr Brunel wouldn't approve of your saddle tank either then?

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...