Afternoon all
Sorry for the lack of postings recently, but progress is being made.
Don't know if it's the influence of Springwatch or the Chelsea flower show, but things are definitely blooming in Clevedon.
Fencing has been completed and the last of the various sheds have been built (finally). Signalling is all built.
With all the boards up, I've been planting static grass and am starting on the various trees and bushes. Fibres are a blend of Heki with some Green Scenes straw thrown in.
The main task now is building the lighting rig which is under way. I've got the fish tank tubes and want to have the rig finished before I start blending everything in.
The only signal I'll need to build. It's a MR lower quadrant with an attached ground signal. It's not exactly as per the prototype but it's pretty damn close. All parts are MSE. There are 2 other ground signals to be planted.
The railcar approaches the occupation crossing (which is made from a MSE nickel silver etch).
The last of the sheds
Railcar departs for Weston
There's still a way to go, but I'm quite pleased how this is turning out.
- 14
8 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now