Clevedon refresh
Told you I'd get the boards for Clevedon out. First board now installed in the tinking room for wiring up. Have decided the loop turnouts will be driven via wire in tube from SPDT switches. The remainder surface mounted Caboose Industries turnout throws. Routed out the two end channels. Will backfill with Rocklite once the tubes are in.
Feel like the modelling mojo's definitely returning. I plan to make the ballast look a lot more light railway is before it's finished. The first board will be entirely scenic and is the Weston end.
Edit - let's try that with both photos shall we?!
- 2
0 Comments
Recommended Comments
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now