Jump to content
 
  • entries
    76
  • comments
    344
  • views
    41,857

Cheddar P4 - testing, testing


ullypug

789 views

So the good news is a week on and the panel and board have been connected up and duly tested. Trains have run, generally in the directions they were intended to and generally without falling off, though there is one rail in the slip that needs glueing to the slide chairs as it's wandering a bit.
The only real issues were frogs wired up incorrectly to the tortoises, but that was a matter of moments to swap wires around.
I can start fettling the track and test in earnest, though I really should learn to clean everything before I expect too much. However a selection of engines have pottered around, sometimes simultaneously as I've wired for cab control on DC to start with.
With some time off over Christmas, I should be able to get this board signed off and ready to move on to the next one. The panel obviously was the key to everything and hopefully I can now make faster progress than I did last year.

  • Like 8

2 Comments


Recommended Comments

That seams an unusually short baseboard, or am I missing something? Glad to hear your making progress and getting stuff moving.

Dave.

Link to comment
  • RMweb Premium

That seams an unusually short baseboard, or am I missing something? Glad to hear your making progress and getting stuff moving.

Dave.

Hi Dave

yes, they're only 820mm wide, but they are 1000mm deep. I wanted to keep the size down so I can manhandle boards around, the depth is the key and when plugged together forms a solid rectangle shape.

The board in the picture is all wired and working and I've started on the next one now.

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...