Jump to content
 
  • entry
    1
  • comment
    1
  • views
    904

About this blog

I'm moving forward to Proto4, so I thought I should document it

Entries in this blog

The planning begins

Afternoon all,   After talking to a P4 modeller from my native land of Australia, I have decided to move to P4. Before going all out, I shall be building a test layout with a stretch of track, passing loop and a general siding. The point of this is to gauge the difficulty and time commitment needed to model in P4.   I shall be converting a few Bachmann wagons and a suburban break coach as well in the greatness of time.     I shall try and keep this upto date.     Zach

Speedbird

Speedbird

×
×
  • Create New...