Jump to content
 
  • entries
    21
  • comments
    84
  • views
    13,547

JLTRT GWR Pannier tank kit. Now this is the very last kit build. 2 Superstructure.


ROSSPOP

984 views

Nice kit so far with some innovative ways of constructing a square footplate. One complex area the pannier tanks is a quality heavy resin moulding more of which later.

 

There are very good detailed etched overlays which saves on the riveting front. The footplate sub-unit keeps the work nice and square and is an easy fold assembly.

 

blogentry-17779-0-41508000-1525884023_thumb.jpg

 

I chose to remove the etched lamp irons and replace with the nice lost-wax cast versions supplied with the kit.

 

blogentry-17779-0-38043000-1525884049_thumb.jpg

 

I think these look better

 

blogentry-17779-0-76573600-1525884069_thumb.jpg

 

There is some riveting to do around the splasher surrounds.

 

blogentry-17779-0-94585500-1525884090_thumb.jpg

 

My 80watt iron was not hot enough to solder the detailed overlays to the cab and bunker sub units and so a flame heat was required for a successful finish, particularly the cab front and sides.

 

blogentry-17779-0-06973300-1525884586_thumb.jpg

 

The instructions suggest adding some of the awkward lost wax details to the sub-units before final assembly onto the footplate.

 

blogentry-17779-0-25577300-1525884151_thumb.jpg

 

Having searched for and studied other modellers constructions of this particular kit I was aware of the difficulties encountered with the construction of the bunker. The above corner castings(bottom right) are not quite the right size and a poor fit, so I knew it was`nt going to be a perfect build.

 

First up is the shaping of the side overlays.................................................................................

 

blogentry-17779-0-84146000-1525884177_thumb.jpg

 

............and then attaching them to the sub unit.............................................

 

blogentry-17779-0-79753500-1525884191_thumb.jpg

 

 

 

The following pics are my final effort.............................................................................................

 

blogentry-17779-0-54905300-1525884240_thumb.jpg

 

blogentry-17779-0-13777200-1525884220_thumb.jpg

 

blogentry-17779-0-80961300-1525884260_thumb.jpg

 

As previously mentioned a large part of construction is a blue resin moulding of the pannier tanks and boiler, which saves a lot of heartache!!
i chose to drill and tap 8BA to attach to the footplate to be removeable for painting later on.

 

blogentry-17779-0-88340200-1525890415_thumb.jpg

 


blogentry-17779-0-56752200-1525890439_thumb.jpg

  • Like 5

1 Comment


Recommended Comments

  • RMweb Premium

I like the footplate construction method. Er, lets call that a hint for etched brass kit designers in general.... 

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...