Jump to content
 
  • entries
    58
  • comments
    30
  • views
    26,474

The Long Drag to Garsdale – Coal Road SAC Bridge 115 pt6 Completion Pt2


Southern Fabricator

906 views

Well now the railings have been revisited. I am now using a brand new 0.71mm 60/40 solder and a Rosin soldering flux paste to see if the previous result can be improved. The styrene solution for the rails is an option of last resort for me.

 

The reason why I am persisting with this is because I really do need to sharpen my soldering skills as I contemplate the Dandry Mire Viaduct safety railing and kit building the semaphore signals and the Network Rail radio link tower, not to mention the layout track droppers and so forth. Also I reason copper wire may be more forgiving should ‘the hand of god’ fumble near the mainline. In a perfect world there be no derailments!
Perseverance pays!! As the picture shows the safety rails whilst not perfect, are to my own satisfaction and hopefully reflect the prototype Ø 42mm pipe work.

  • Like 2

0 Comments


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...