First Track Laid
So started laying some track last weekend. I am slowly realising the monumental task of wireing up a layout with electrofrog points. All the track I am using is Peco Streamline 100 and all points are electrofrog. I did get impatient after a while and wire some of the track up just to see a train running on it. Thinking I may swap the pos and neg wires as the black will be less visable on the bottom rail.
Not really sure how you measure the radius’s, I’ve got what they should be on the plan. I just measured out where the points should be on the baseboard, fixed them down and then put the flexi track in between. I know some trains don’t run round corners that are too tight. I’ve run a couple of locos and rolling stock around the ones I’ve done and nothing derails. It will be a while before I start ballasting so I hope to find out if they are too tight before then. Any tips on this would be helpful
0 Comments
Recommended Comments
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now