Boxfile Kyle - Progress
Good evening - Tonight saw the first part of the construction for the track using EASITRAC. The track will be built on a 1mm card base and then this be framed with foamboard to suit.
Firstly, a simple piece of straight track was made using some 500mm precut lengths from the 2mm Association. Cast brass sleepers have been added at either end to strengthen the joints. Secondly, the turnout base has been laid in position and connected to a short length of straight track - the next work session will begin to make the turnout.
A few pics attached of progress...
4 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now