Hi all.

 

Just a couple of quick photos showing the current state of track laying on Ropley. The yard entry point is now motorised, the Barry slip is complete bar a couple of check rails and the points for the C&W shed lines are coming along. Unfortunately I'm now waiting for a fresh supply of sleeper planking having run short following the re-positioning & re-building of the yard entry point and a fresh supply of sleepers to finish the yards plain trackwork.

 

07SEPT11-029b.jpg

 

07SEPT11-037b.jpg

 

With a bit of luck, the trackwork could be finished by the end of this month and then it's on to landscaping!

 

Cheers,

 

Tom.

  • Like 3

4 Comments


Recommended Comments

  • RMweb Gold

Thanks Graham!

 

Have a go! It's not as difficult as you'd expect. I would recommend using the jigs made by the 2mm scale association though, especially for producing the frog, and a good file is essential for the blades!

 

Tom.

Link to comment

Nice Tom. Are you going the whole hog? Would love to see it engulf the Station, carriage and boiler shop and of course the engine and wheel drop sheds.

 

Martin

  • Like 1
Link to comment
  • RMweb Gold

Hi Martin.

 

Space limits me to just the yard area at the moment, with a little of the shed & wheel drop and a portion of the Carriage & boiler shop. However another board could easilly be added with the station on, and that is the long term plan once space allows!

 

Cheers,

 

Tom.

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...