Jump to content






Photo
- - - - -

base boards up

Posted by nigelb , 01 December 2010 · 182 views

Well after a sunshine break I have really got going the two main boards are made and up nice blue curtain around to hide the junk ...... modeling materials beneath

next step is the Templot paper plan stick to a sub board ( old H&S sign )
i have ordered the turnout operating units from the 2mm association when they arrive its drill the fixing holes and commence track laying

in the meantime i must cut a template for the platform to give me building construction breaks from the track laying
mmmm wonder if i could get a snow day tomorrow ??? got a touch of gods dandruff here in Acton is all.

Attached Thumbnails

  • Attached Image
  • Attached Image





Photo
SteveBedding
Dec 01 2010 22:04
Looking good - and even better in 2FS!

Keep the updates and pictures flowing please :good_mini: