Jump to content
 
  • entries
    23
  • comments
    86
  • views
    23,913

Another plan...


Kelly

419 views

Decided to download Inkscape and have a go drawing a full plan. It is still rather rough and still needs more thought, but I think its starting to give an idea of whats what and where etc.

 

Added a road section to allow lorries to load/unload from the transship shed as well as a tank/truck/vehicle ramp for loading/unloading onto trains etc.

 

kelly

3 Comments


Recommended Comments

As a matter of interest what's the purpose of the 'rat run'?

 

To allow transfer between the two fiddle yards really. It should start after the scenic break really, and be linked to both lines, but it was added as a bit of a afterthought.

 

 

 

Link to comment

It does need some tweaking mainly in the positioning of the transhipment sheds. These are to be located at 90% to the main lines. The access road that comes over the bridge on the main line will run along side the transhipment shed (the side you have the narrow gauge on) and the access gate would be from there leading to a loading/unload area or access to the transhipment shed (over the narrow gauge if necessary). Need to add the blast sidings too. I'll have a tinker with it and see what I can come up with. :help:

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...