Ground frame huts and other odds and ends
By popular(ish) request this is a brief update on the preparations completed this week in the run up to Newbury exhibition.
1st Avonwick had 2 ground frames both covered by huts, my good intentions were to have had both of these built but work this week has meant that I only got one completed today. It's far from brilliant but it is about right. At some point before Easter I will try to get the second one completed and maybe get some point rodding in.
I have also been sowing some grass on the bridge section of the layout. This is only the initial sow, so more work needs to be done on this.
Other that that I have badly stuck the info board together and worked out how to stop it falling down, at some point I will need to re do this. (Several grammatical errors have also been pointed out by the other half).
A 16 ton mineral wagon has been completed as have a couple of coaches (well as much as parts allow).
A couple of name boards have been added to the station.
That's all for now. Tomorrow packing will take place ready for me to leave at about 4 on Saturday.
7 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now