Jump to content
 
  • entries
    54
  • comments
    228
  • views
    63,541

Plug & Play!


Dukedog

436 views

Being the clumsy person that I am, i was getting a bit fed up of catching and damaging the ground disc signals on Pen Y Bont every time I cleaned the track.

 

After replacing the Ratio plastic ones several times I was getting a bit tired of buying and making up new ones. So when I came across some white metal ones made by Detail Matters.I jumped in and bought a pair.

 

They come ready painted so that was another fiddly job saved. However, they were still vulnerable to accidental damage.

 

Then I came up with this idea.

 

blogentry-6768-0-60072100-1316798401.jpg

 

blogentry-6768-0-63073800-1316798188_thumb.jpg

 

I drilled a hole right through the base board and fixed in to it a short length of brass tube with a bore that just takes the spigot on the base of the signal.

 

I can now remove the signals for track cleaning and layout transporting without fear of damage,

 

The Yard crane suffered from the same problem.

When I built the brass replacement I made that "Plug in" as well. Again it can be removed when transporting the layout or doing any work that could cause me to accidentally bash it!

 

blogentry-6768-0-60583300-1316798559_thumb.jpg

 

I also did the same thing with the loading gauge (not pictured)

Now I can work on the layout without fear of causing myself a load of work I hadn't bargained for.

 

 

Cheers for now

Frank

  • Like 2

1 Comment


Recommended Comments

  • RMweb Premium

Nice tips there Frank.

 

I was disappointed to hear that your next exhibition outing is next weekend; I'm booked on the Train of Hope Railtour, so looks like I'll miss out yet again!

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...