Jump to content
 
  • entries
    54
  • comments
    228
  • views
    63,541

On the fiddle!


Dukedog

922 views

Yes! it's wood butchering time again!

 

I've made a start on the first of two fiddle yards for my new Cambrian modular layout, currently one module is built and finished (?) Morfa Bach.

The second module (Penmaenpool MPD) is under way and the track is down. Next job there is the turnout operating motor installation. How ever this has been put on the back burner for a day or two whilst I took advantage of dry weather to work outside and butcher some more wood!

 

The fiddle yard shown here is for the Morfa Bach end of the layout. I looked at several designs for fiddle yards and finally settled on a turntable type.

The main reason for choosing this design is the fact that I can turn round complete trains without fear of damaging any stock. The turn table will have three tracks, and each road will hold a loco and a couple of coaches which is enough for what I need to operate the layout.

 

The fiddle yard progress up to date is shown in pictures below.

 

7222173892_c720b949b6_o.jpg

The turntable in the centre road running position.

 

 

7222172984_f54b599451_o.jpg

The turntable swung out.

 

Construction is from 44x18 softwood, 6mm and 9mm plywood. The turntable just turns on a simple 6mm bolt through a horizontal cross member. The table being shimmed up tp level with the fixed section with steel washers

 

 

7222174472_9e77f676a0_z.jpg

 

A "Nyloc" nut is used tightened up so as to make turning the table by hand easy but at the same time take up any sloppiness in the fixing.

The final job for today was to drill holes in the side members at the layout end to accommodate the 5 pin DIN socket for one of the "cabs" and a 9 way D plug for the interconnections to the main layout board.

 

7222174968_fd8ea85759_z.jpg

 

There is still work to do but that will have to wait for more dry weather!

 

 

Cheers for now

Frank

  • Like 7

2 Comments


Recommended Comments

Looks like a lot of work has gone into the TT, nice job. What did you use for the bearing faces?

Link to comment

Looks like a lot of work has gone into the TT, nice job. What did you use for the bearing faces?

 

Hi, and thanks for your comment.

 

As this was my first attempt at this type of arrangement I wasn't sure about bearings as such, plus I wanted to keep costs down as I wasn't sure if it was going to work.

All I have used is "penny" washers as spacers between the frame and deck.. I might consider some improvement once finished and working properly.

HTH

Frank

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...