Jump to content
 
  • entries
    268
  • comments
    567
  • views
    130,628

Comet large window first A20 part 4


The Fatadder

661 views

It's been a while since I last worked on this coach, but now I have a new soldering iron progress can continue.

 

When I left off there were the following jobs remaining
-interior
-roof detail
-hinges
-corridor connections
-drop lights

 

The hinges and drop lights should have been fine before fixing the sides to the ends. Doing them after certainly added complexity. I tried to use masking tape to hold in place while I tacked in place, but a combination of tight access and my lumpy soldering on the ends made it tricky for the door windows

 

The corridor was a lot easier, but glazing the model will be fun, as there's next to no material between the edge of the drop light etch and the edge of the window. If only they had just been half etched as part of the side!

 

With the drop lights in, the next job was to glue on some cast corridors and pipes

 

blogentry-54-0-72222800-1490651939_thumb.jpg

 

Shown is the more interesting side of the coach, which gives
The design it's name

  • Like 4

0 Comments


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
×
  • Create New...