Enough of Duke of Gloucester and on with the current layout.

8206992540_503e718c0f_b.jpg

The Grand Plan – at inception

As planned and initially constructed the layout was to be ‘Out and Back’ with a Main Terminus, a double track mainline leading to ‘the Main Junction’ and then heading off to a return loop with storage sidings.

The plan would build on past experience.

3053138738_3f92470139_b.jpg

The Bracken Ridge Layout

My first serious layout, the Bracken Ridge layout dated from around 1980. It was an ‘out and back’ layout and occupied about 16ft x 6.5ft with a minimum radius for running lines of 3ft. Entry was at the top left by ducking under. There were three levels. The terminus was at the top right on the intermediate level. The hidden sidings and reversing loop were at the bottom right at the lowest level. There was an intermediate station at the top left at the highest level. I wanted a continuous run (for testing) and this was achieved with a non prototypical single line along the bottom of the layout which joined the exit from the reversing loop to the line from the low level terminus. Trains could shuttle between the Terminus and the intermediate station, or they could go off and disappear round the reversing loop.

3053141146_63f286b36b_b.jpg

The Park View Layout

We moved house around 1990 which saw the creation of the Park View Layout. This time the space available was about 11ft x 8ft. Again this was an ‘out and back’ layout with a minimum radius for running lines of 3ft. The maximum train length for the Main Terminus was seven Mark 1s whilst branch trains were limited to four coaches. The doorway opened into the room at the bottom right which required some cunning construction to support the baseboards. The Branch Terminus was at the highest level, top left. The Main Terminus was at the intermediate level, top right. The hidden sidings and reversing loop were at the lowest level. The hidden sidings are not shown on the drawing but are hidden beneath the tracks at the top left. There was an Intermediate Station adjacent to extensive loco facilities which occupied an intermediate level between the Main Terminus and the reversing loop. A major disadvantage with this layout was that there was no continuous run!

3060673993_66a9a5a290_o.jpg

The Park View Layout – hidden sidings with supports for the Main Terminus

When it came to planning the current layout it would be ‘out and back’ with a reversing loop and hidden sidings. It would handle seven coach trains and most importantly of all – there would be a section of continuous double track (the Round and Round bit). The layout would be like a letter P. The Main Terminus would be the stick of the P. For the Round and Round bit there was a space of about 12ft x 9ft which also had to accommodate the hidden sidings and the reversing loop (the Up and Down bit).

12889466944_a3dd1ef46b_b.jpg

The Main Junction at the Planning Stage

The layout above is essentially what is visible and should be compared with the drawing below used in a previous Blog.

10932588766_c7e293ff0c_b.jpg

The Main Junction as built

The reversing loop and hidden sidings were added in beneath the Main Junction as shown below on a very poor paper drawing.

12889477064_a30e50d7a7_b.jpg

The Hidden Sidings beneath the Main Terminus

The ‘out and back’ lines from the Main Terminus are shown at the bottom left at the lowest level. These climb up to join the Round and Round bit that includes the Main Junction. At the same time lines drop back down to form the Reversing Loop.

3051436670_cfcb2893f4_b.jpg

Under construction – the hidden sidings

Finally for tonight an under construction picture showing the arrangement of tracks at the rear of the layout.

3050596425_cb52ba655e_b.jpg

The Up and Down bits at the back of the layout

FT and TT are the main tracks From the Terminus and To the Terminus. ‘Round and Round is the continuous run through the Main Junction Station. RLU and RLD (between FT and the continuous run) are the Reversing Loop Up and the Reversing Loop Down. GWR (Great Way Round or ex GWR branch) was discussed in a previous Blog. Similarly LNWR is the branch connection between the Main Junction and the Branch Junction Stations.

Perhaps some more pictures next time!

  • Like 10

8 Comments


Recommended Comments

Thanks Basil

That is some seriously impressive woodwork!

Screwed and glued with PVA - 1/2 inch MDF for the track beds cut with a jigsaw.

 

Regards

 

Ray

Link to comment

Is it just me, or is the smell of freshly sawn timber one of the best things about starting a new layout. Ray this is a really impressive looking layout

Link to comment

Thanks Paul

 

Yes

 

..is the smell of freshly sawn timber one of the best things ..

I have a box of offcuts under the layout which I can take the lid off when I need a pick up.

 

Regards

 

Ray

Link to comment
  • RMweb Gold

Hi Ray, I really like those first two hand drawings, especially Bracken Ridge. They have that yellowed rennaisance style. You and Leonardo!

 

 

davincicrossbow.gif

Link to comment

Oh great, Mikkel

..... They have that yellowed rennaisance style. You and Leonardo!

I am not that old-  and haven't gone yellow only a bit silver.

 

Thanks

 

Ray

Link to comment
  • RMweb Premium

Beautiful woodwork Ray.  A very carefully thought out and executed plan. A lot can learn form this sort of approach - I'm much too much in a rush all the time and need to take a leaf out of your book.  Excellent layout building.

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...