A stretch in time
This week has been dominated by the removal of our oil fired central heating - so not much railway modelling. The single track junction is now ballasted:
I think the track was laid before the rest of the layout was completed and access to the ends of the sidings now requires great physical stamina and not a little patience! Hence the Blog title 'A stretch in time!. As usual I have provided card bases for the Goods Shed and Engine Shed:
A picture with work in progress and then another showing the buildings in position. There is a coaling facility planned for the siding to the right of the engine shed but that will have to wait for another day (year)
The junction is supposed to represent somewhere in mid Wales where a single track ex GWR line meets up with another single track ex LNWR line. This allows the use of a range of Bachmann / Mainline BR (WR and LMR) rolling stock:
- 1
2 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now