Kyle - Further update...
Evening all,
Following on from the last entry I have since managed to simplify the wiring and the new turnout is in place and trains run through it - a couple of locos need a check on their Back to Backs before I start tweaking the frogs...which was a downfall of the previous ones I think.
With this in mind I decided to build the second replacement turnout under the road bridge as the layout has quite a few shows over 2019/2020. I started this yesterday afternoon before bad light stopped play and continued fresh this morning. A test wagon and coach appear to run through smoothly so next week it will be gapped, primed and then a few key wires added as before.
This will be an interesting fit as just overlaying it with the two diverging roads means the tiebar will sit right at the edge of the scenic baseboard so I will need to rip out the existing wire in tube under the platform and reroute a new one.
I will try to get the old turnout cut out and the new one installed this side of Christmas to leave redoing the fascia and scenics in January.
Overall, progress is on programme I think
A few pics...
Old School on the turnouts using the 2mm Association jigs...
A few easitrac sleepers on the ends to keep alignment...
Dropped in place for test fit...
Comments welcome as always...
Pete
- 6
7 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now