Jump to content




- - - - -

Br2


Br2

May 2016. To do this I fitted the wooden bridge first, then laid the track over it. Once fitted and I was happy with it, I cut the track , being careful where I cut, and then lifted it out. its a bit of a fiddly solution but thankfully works ok. I then wired up the track in such a way I can run trains with it fitted or without. The bridge then hangs by chain when not being used.