Jump to content
 

A new start


del00

Recommended Posts

  • RMweb Premium

Hi,

 

I thought it time to post my progress so far.

 

A while back (6 years) I started a thread about a test layout that I was building.  This layout was purely so that I could see what I was doing wrong or right.  The layout only got so far and so posting stopped.

 

I have been granted access to the loft for my second attempt, so hopefully all that I have learnt from previous attempts will not be in vain.

 

I shall try and give as much detail as possible when describing how I have done things, please feel free to comment and add constructive advice.

 

The layout is approx 13ft X 8ft.  SCARM diagram below.

 

post-7635-0-23481300-1470931267.jpg

 

This is on 2ft X 8ft 9mm ply for the most part, the section going around the loft hatch is only 1ft wide so that you can still get in and out of the loft.  This leaves a good sized space in the middle for work and operation.

 

The first issue was that the plan needed to be flipped due to the hatch.  The second issue is that the green track was going to be a raised level, but the inclines would have been too steep, so it is now a pancake.  I can cope with this.

 

So, what is shown on the left of the plan, is now on the right.  The layout will feature a mainline through station with island platforms, a second station/halt on the opposite side with a loading depot and TMD.  The track running around the outside of the plan is a non-scenic run around and will be hidden.

 

The first thing that became apparent about the test layout was that the construction of the baseboard did not need to be so industrial.  The use of 12mm chipboard, 44mm X 44mm and 100mm X 25mm bracing was completely over the top.

 

post-7635-0-01211400-1470932436.jpg

 

Chipboard is not the easiest material to screw into and the bracing obstructed the underside preventing use of hidden point motors among other things.

I have used 9mm ply, with 44mm X 44mm legs and 12mm X 44mm edging and bracing were needed.

 

Link to post
Share on other sites

  • RMweb Premium

Continuing on as I posted by mistake while trying to find out how an indent had appeared.

 

So, 9mm ply with 44mm X 44mm legs and 12mm X 44mm edges and bracing.

 

post-7635-0-35778100-1470933015.jpg

 

This photo also shows the hatch at the bottom explaining the need for 1ft wide ply boards.

 

The baseboards were installed without too many dramas, as long as you don't look too closely.  Then came the underlay for the track.  As before I went to Wickes and purchased a lot of cork tiles.  These are 3mm deep and 305mm X 305mm squares, they can be cut very easily using a stanley knife.  This is then adhered to the baseboards using good old PVA glue, they are then clamped or weighted down and left for 24hrs to set.

 

post-7635-0-95977200-1470933366.jpg

 

Starting with the run around/ hidden section I then started to lay the track.

 

post-7635-0-24642500-1470933495.jpg

 

Yay, my first piece of track.  As you can see, I used track pins.  The test layout track was glued down with PVA.  This started to come away from the cork due to the heat.  This occurred after ballasting so became a big problem.  Despite the temperatures in the loft, so far the track has all stayed in place.

 

This is all for now, weather permitting I will be back in the sauna, freezer, loft this weekend and will post progress next week.

Link to post
Share on other sites

  • 3 weeks later...
  • RMweb Premium

Hi Gary,

 

Sorry for taking so long to reply, I have been trying to find the time to write this post.  A bit of background is probably what is needed.

 

There is no era, I have collected a wide variety of rolling stock over the years, making impossible to define a time.  The layout itself has no real place, the main station will be loosely modeled on the stations along the route out of London Liverpool Street towards Shenfield.  It will be called Kings Gate.  The second station will be Heath Park Depot and will serve the loading depot and TMD. 

 

The layout is DCC.  The buildings will mostly be Scalescenes.  The track is a mix of Peco and Hornby, the Hornby stuff is what was I could recover from the test layout.  Turnouts are powered by Seep PM1's which will provide feedback to the control board to illuminate route denoting LED's.

 

The DCC control is by Hornby's Railmaster and Elink.  I did have a Bachmann Dynamis, but it has not survived the last six years and no longer works.  The reason for going for Elink was purely based on cost.  My brother has a habit of giving us WHSmiths vouchers for birthdays and christmas.  These mount up as I can only find printer ink to buy with them.  During their January sale, they had the Western Master set reduced and with the free delivery on the price break, it meant getting a free way of controlling the layout.  I have been interested in control via PC for a while, but all options were out of my price range. I am aware of systems like JMRA, but don't really have the time or inclination to code operations.  Can't wait for Hornby to release thier Loco Detection system.  I am not holding my breath, I get the impression that the wait will still be a long one.  When funds allow, I will bring the control of the Seep's onto the computer.

 

Hi Les,

 

You're right, trackpins serve the purpose well.  I may remove some of them in the more obvious, photogenic areas.

 

Despite the temperatures in the loft, I have got as much of the track laid as I can.  I have completed the run around, main and secondary stations.  The loading and traction depots will have to wait for the moment.  This has been determined by funds.

 

Photo time.

 

post-7635-0-56341700-1472832805.jpg

 

post-7635-0-12934100-1472832654.jpg

 

post-7635-0-19789400-1472832833.jpg

 

As you can see, I am using the spare space as a workbench, but I am running out of room quickly.

 

post-7635-0-37900900-1472832954.jpg

 

post-7635-0-91974900-1472832997.jpg

 

post-7635-0-14088000-1472833026.jpg

 

I have been researching a way of distributing power and DCC signal.  I had found that adding the droppers under the track worked well on the test layout so used this method here.  Its a bit of a faf trying to accurately drill the holes to pass them through the board, but the end result is worth it as they do not show at all after ballasting.

 

post-7635-0-59734100-1472833158.jpg

 

The droppers are .75mm electrical wire.  I still had a 50m drum of the stuff laying around.  While looking at the various ways of connecting them all up under the boards, I came upon these.

 

post-7635-0-23205400-1472833486.jpg

 

They are small brass power distribution bus bars.  Ideal for the power cable and droppers, as you can see, each cable has its own place and is held by a retaining screw.  This may be useful later if I have to isolate a section of track.  They can be found at HobbyTronics.

 

Cabling to the PM1's is by six core alarm cable.

 

post-7635-0-52011700-1472833875.jpg

 

I found this at Rapid Electronics.  Self contained, available as a 100m drum for less than £20.  Make sure you check the tolerances before ordering as they have several types available.

 

That is all for now, my next post will be a how I done it for the installation of the point motors.

 

Hope that you like.

 

Del

 

 

Link to post
Share on other sites

  • RMweb Gold

Very nice Del,

 

I used to have a no era, no region layout which I still own all the stock from so although it doesn't get seen on my thread some very inappropriate stock has appeared on my layout.

 

As for the cost of DCC I totally understand and in fact ended up making my own DCC controller as it is so much cheaper. I'm currently looking into a way of making my own accessory decoders from an Arduino microprocessor. I would be happy to share with you if you were interested once I have got it working.

 

Gary

Link to post
Share on other sites

  • 1 month later...
  • RMweb Premium

Progress has been slow, mainly due to the weather.

 

So in place of any progress photos, here is a description of how I installed all the points and got the solenoid motors aligned correctly.

 

On the test layout, I drilled a 10mm hole under where the tie bar was and just screwed the motors in underneath.  While this is quick and easy, it does lead to issues with the alignment of the pin travel bar.  The operating pin is not always installed along the plane of the tie bar.  This results in a re-installation, mostly by guess work to get the motor to operate correctly.  On top of this, the 10mm hole means that ballasting becomes a nightmare and so points are often ballasted only so far, creating a scenic nightmare.  With well over 20 points to install, I wanted a more accurate and tidy installation method.

 

This is only a how I done it, I am not trying to teach anyone how to suck eggs.  If you find the method helpful I am happy.  The method is for seep solenoid motors, but I am sure the practice can be used for others.

 

 

First create a template of the point motor.

post-7635-0-72634400-1476368334.jpg

 

Make sure that the centre of the pin travel line is marked.

 

Now mark the geometry of the point it self.  Place the point on the baseboard where it is going to be installed and mark either side of the tie bar and the middle of the track at both ends of the straight section.

post-7635-0-32266700-1476368734.jpg

 

Remove the point to show the marks.  Join the marks to form a cross.

post-7635-0-93828900-1476368803.jpg

 

Place the template on the line of the tie bar with the centre of the pin travel on the centre of the cross and mark the corner screws and the length of the travel of the pin.

post-7635-0-69223800-1476369026.jpg

 

Remove the template and mark the ends of the pin travel marks across the tie bar line.

post-7635-0-89827100-1476369099.jpg

 

You now have all the information that you need to install the motor correctly.  Chain drill a line between the two pin travel marks to create the aperture for the pin and drill guide holes for the screws.

post-7635-0-15190600-1476369294.jpg

 

I used a 3mm bit for the chain and a 1mm bit for the screw guide holes.  Use a tile cutter bit to connect the chain so that you have an adequate aperture for the pin to move.

post-7635-0-66067900-1476369430.jpg

 

You will end up with this.

post-7635-0-95697000-1476369500.jpg

 

As seen from above the baseboard and this.

post-7635-0-92705000-1476369553.jpg

 

As seen from below.  Screw the motor into the baseboard.

post-7635-0-61140500-1476369655.jpg

 

Use a scrap piece of track to mark the height to cut the pin.  I used a pair of strong electrical wire cutters to do this.  Be aware that the pin is hard and if you cut using this method the piece of cut pin WILL fly of in a random direction at extreme speed.  Be very careful.  You can use a cutting/grinding piece on your rotary multi-tool, but you may have to use something to hold the pin in place as it moves about.  I do not suggest cutting the pin after the point has been installed.  If you cut with wire cutters there will be a bit of pin standing proud which could cause a short.  Using the grinding tool on a rotary could cut into the tie bar itself.  The fiddly bit is getting the point onto the pin.  With a bit of practice, this is not too much of a problem.  There is a youtube video of a gentlemen using a piece of thread to guide the tie bar onto the pin if you find the unguided method too stressful.

 

As I said, progress has been slow.  I am now working on the control panel which will be in two parts, one for either end of the layout.  I will post details of their creation when they are complete.  At some point I should also post pictures of the rolling stock.

 

Gary, I have been looking at the Arduino for accessory control, so I may come to you for assistance in the future.  I will also sign up with MERG when funds permit.

 

As I said in an earlier post, I am interested in the automation of operations.  I have been looking at both JMRI and Rocrail.  I do not want to start an argument, but is there any real difference in the operation of the software and the writing?  I will in due course be exploring the use of RFID as loco detection if this helps.

 

That's me done for now.  Many thanks for looking.

 

Del

 

 

 

 

 

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...