RSS Fetcher Posted October 18, 2017 Share Posted October 18, 2017 And so to the steam pipe to the cab from the dome for Yellow Peril.After studying two photos it is clear that there is some form of steam cock with a handwheel connected to lagged piping coming from the dome. So 1mm wire, drilled 0.4mm on the end with 0.3mm wire soldered in, then the smallest hand wheel from an 00 mse point rodding set sweated on. The handwheel is a 4 spoke not three like the real thing but hopefully I will be forgiven that .... Optivisor to the max lol Next is to file a flat in the side of the 1mm wire and drill a 0.5mm hole to take the 0.45mm rodding to the cab. A bit of shaping and it should be ready to fit Attached thumbnail(s) View the full article Link to post Share on other sites More sharing options...
Recommended Posts