Jump to content
 

Aberystwyth & Rheidol Valley


RJS1977
 Share

Recommended Posts

Some more progress made this weekend - both tracks to the turntable now connected in and wires soldered on to the loco depot headshunt, and a dodgy point at the end of Platform 3 replaced.

 

On the downside, the point where the double track becomes single at Llanbadarn started losing electrical continuity (as the main feed to the layout is on the single track at Llanbadarn crossing, this effectively stopped the layout working!). I found a point motor with a twin microswitch in my bag of point motors so now fitted and wired in and trains can run again.

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...