Jump to content
 


mattym1985
 Share

Recommended Posts

Hello All

 

This new layout is going to be my first really attempt at making an exhibition standard layout. It is going to be set in North Yorkshire (suggestions on a name would be helpfully), based around a small village with a branchline terminus,

 

The layout will be DCC and controlled via a gaugemaster prodigy advanced 2 with Megapoints for all the points and signals, with possibly getting the DCC module for Megapoints as well.

 

The main station boards are going to be 3ft long by 2 ft wide, with the rest of the scenic boards 2 ft wide by 4ft long, the fiddle yard boards are going to be 4ft long by 1ft wide.

 

The layout is going to be housed in my bedroom as i don't have any other space to build it.

 

Here is a view of my track plan.

 

post-13714-0-99397900-1518369680_thumb.jpg

 

I hope to start construction of the new layout in the next few weeks all the track has been ordered same with the wood to build the layout with, and i hope to have a weekly update on my progress in building the new layout.

 

If i feel like i can do it, i will also be doing an update via youtube otherwise it will be just on here.

 

Well wish me luck, i think i am going to need it.

 

matty

 

 

Edited by mattym1985
  • Like 3
Link to post
Share on other sites

  • RMweb Gold

Is there a reason for that double-leaf fiddle yard?

 

I'd suggest that the limited space to run around trains at the terminus makes the double leaf a good use of space; 7 roads all of which can be accessed at any time, L.  If I might make a suggestion to Mattym, I would want to space the fiddle yard roads out more so there is room between them to get at stock you want to lift off without disturbing it on the adjacent road.  Or it may be better to have the longer fiddle yard boards as the station area, despite sacrificing some width and scenery.

 

Good plan though; looking forward to hearing about progress.  Name suggestion, given the Hornby controllers and Norse influence on town and village names in that part of the world, Horby!

Link to post
Share on other sites

Hi Matty,

look forward to seeing this project develop over the coming months and would highly recommend taking a look at the 'Little Muddle' thread for inspiration as this shows how a simple track plan can look stunning (Less is more as they say).

One point I would consider changing however is the fiddle yard. I would be tempted to go 'Single Leaf' to provide long sidings for displaying/storing rolling stock not in use and this could even be modelled as a locomotive/carriage storage area or alternatively add a station halt or coal yard/goods area to give the branch a sense of purpose and somewhere for trains to go to rather than just disappearing under a bridge or tunnel.

At the end of the day though... it's your layout... so develop it how you want and don't be tempted to be driven by what the current 'In thing' is.

will you be limiting passenger services to 2 coaches or do you intend to incorporate an early 2 car DMU (as I think one of these weathered and with sound would sound Grand Grommit.)

If its Yorkshire I expect there will be coal wagons somewhere.... and sheep!!!! but alas no cider or cows.

Yours Aye,

Giz

 

Link to post
Share on other sites

hey all thanks for all the comments and wishes of good luck, I haven't fully decided on the fiddle yard yet so i can change the plan. it will be a mixture a dmu and coahes

 

i'll keep posting regular updates on my progress

 

regards 

 

matt

Edited by mattym1985
Link to post
Share on other sites

hey all

 

Well update time the wood has been collected today and the track is been picked up tomorrow from the Model Center at Beckhole in Goathland, so i can start construction tomorrow or Sunday, i think its going to take me about a month before i have a running train on the layout, but we shall see.

 

regards

 

matt

Link to post
Share on other sites

  • 2 weeks later...

Update time

 

Well Baseboard construction has started, will be adding some photo's tomorrow of the progress, so far 3 of 5 station boards have been completed, once all the station boards are complete I will be starting to lay the track.

 

Here is my completed station baseboards

 

post-13714-0-75302900-1520164545_thumb.jpg

 

The boards are 3ft wide and a total length of 10ft

 

regards

 

Matt

Edited by mattym1985
Link to post
Share on other sites

  • 2 weeks later...

Well all the baseboards are now complete, the track has been laid and tested on the station boards, just got to get the rest of the track finished and the fiddle yard track laid and i think its time for a few trains to run.

 

Will post some photo updates tomorrow,

Link to post
Share on other sites

  • 2 weeks later...

Update 30/03/18

 

Well having the easter bank holiday week off work has enabled me to get a fair bit done, all the baseboards are now complete, track has been laid and tested (all good so far), the servo's have been installed for the points and tested, and construction has been started on the 2 platforms.

 

post-13714-0-48565300-1522400378_thumb.jpg

 

post-13714-0-02332200-1522400391_thumb.jpg

 

post-13714-0-56671600-1522400402_thumb.jpg

 

post-13714-0-69440000-1522400444_thumb.jpg

 

post-13714-0-80387500-1522400462_thumb.jpg

 

post-13714-0-56543600-1522400477_thumb.jpg

 

The platforms are the scalescenes kit built on a layer of 3 2mm think card bases

 

Well back to it, will post another update when the platforms are completed

 

regards

 

matty

 

Link to post
Share on other sites

update 31/03/18

 

I have completed platform 2 and started construction of platform 1.

 

I have also decided on a name for the layout, Scholes this is a small village on the outskirts of Leeds, west yorkshire, it has an old quarry near by, and i will be using that as a base for some of the good traffic going through the station,

 

The station was on the old Leeds - Wetherby line, and was the second stop from Leeds station the first been Cross Gates station, it was originally a through station, but i have turn it into a terminus with the closure of the Leeds - wetherby line a few years earlier than in life.

 

I will post a few photos of the completed platforms shortly.

 

regards

 

mattym1985

Link to post
Share on other sites

update 08/04/18

 

Well the platforms are now complete, just got to try and find a clear varnish from somewhere just to give them a coat to protect the paper, a goods shed from my old layout has been installed and the lights connected up, got to either put a wall or a fence round the platform edge.

 

Start work on weathering the track, this will be a few stage process, stage 1 base coat sprayed on to track, stage 2 track ballasted, stage 3 sleeper grime applied to ballast, stage 4 rails weathered.

 

work has also started on doing the road for the layout this will run along the front of the layout then go around the back of the station to a row of houses these will either be terrace houses or cottages ( i haven't decided on which yet)

 

well i hope to have another update next weekend this time with a few pictures.

 

regards

 

mattym1985

  • Like 2
Link to post
Share on other sites

  • 2 months later...

Update 01/07/18

 

Hey All

 

Sorry for the delay in posting any updates, just been busy. I now have purchased the building kits and I am in the process of getting them all painted and built. I have attached some photo's for you all to see my progress and I hope to be able to do updates more quickly in the future

 

post-13714-0-55407700-1530453494_thumb.jpg

 

post-13714-0-20169000-1530453525_thumb.jpg

 

post-13714-0-13259400-1530453557_thumb.jpg

 

post-13714-0-83174000-1530453583_thumb.jpg

 

post-13714-0-10748900-1530453610_thumb.jpg

 

post-13714-0-22929200-1530453639_thumb.jpg

 

post-13714-0-81819800-1530453662_thumb.jpg

 

post-13714-0-81819800-1530453662_thumb.jpg

 

post-13714-0-28755400-1530453685_thumb.jpg

 

post-13714-0-13635300-1530453711_thumb.jpg

 

post-13714-0-93993000-1530453735_thumb.jpg

 

post-13714-0-94134100-1530453757_thumb.jpg

 

post-13714-0-77030700-1530453782_thumb.jpg

 

post-13714-0-77496400-1530453805_thumb.jpg

 

post-13714-0-29300600-1530453881_thumb.jpg

 

post-13714-0-02683500-1530453903_thumb.jpg

 

post-13714-0-52147000-1530453926_thumb.jpg

 

post-13714-0-21188000-1530453945_thumb.jpg

 

post-13714-0-54788300-1530453962_thumb.jpg

 

post-13714-0-92202200-1530453981_thumb.jpg

 

post-13714-0-99732200-1530454005_thumb.jpg

 

post-13714-0-28731600-1530454022_thumb.jpg

 

post-13714-0-38356800-1530454038_thumb.jpg

 

So the next few weeks are going to be working on the station and goods yards area's get them finished then work on the street scene to the rear of the layout I have alot of kits to make for that area 9 of the low relief terrace houses from Metcalfe to build

 

In progress kits

 

Signal Box

Cattle Dock 

Station Waiting room

 

I'll post some photos of the above kits when they are complete

 

Well that's it for now, more updates to come

 

Regards

 

Mattym1985

 

 

  • Like 2
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...