enginelane Posted December 18, 2018 Share Posted December 18, 2018 (edited) Permission has been granted by the WRMS committee for a layout to be built to replace Troutons due to be completed for November 2021. The layout will be located somewhere on a diversionary route somewhere on the East Coast. It will feature main line running with a cement works and household waste disposal site. It will occupy a similar footprint to Troutons requiring 3 operators per session to operate. DCC. Edited December 18, 2018 by enginelane Link to post Share on other sites More sharing options...
RMweb Gold Joseph_Pestell Posted December 18, 2018 RMweb Gold Share Posted December 18, 2018 Diversionary route because you don't want catenary? Link to post Share on other sites More sharing options...
Roddy Angus Posted December 18, 2018 Share Posted December 18, 2018 Permission has been granted by the WRMS committee for a layout to be built to replace Troutons due to be completed for November 2021. The layout will be located somewhere on a diversionary route somewhere on the East Coast. It will feature main line running with a cement works and household waste disposal site. It will occupy a similar footprint to Troutons requiring 3 operators per session to operate. DCC. Hmm! I wonder if it should be based a few miles south of Dunbar and near a nuclear power station as well? Roddy Link to post Share on other sites More sharing options...
enginelane Posted December 18, 2018 Author Share Posted December 18, 2018 Diversionary route because you don't want catenary? Now how did you guess and the West coast cement works layout is under the wires Link to post Share on other sites More sharing options...
enginelane Posted December 18, 2018 Author Share Posted December 18, 2018 Hmm! I wonder if it should be based a few miles south of Dunbar and near a nuclear power station as well? Roddy And a new power Station fuelled by biomass as well Link to post Share on other sites More sharing options...
enginelane Posted December 23, 2018 Author Share Posted December 23, 2018 One of the traffic flows will require about 25 waste containers being made. Never made a master or cast anything before other than mask making etc when I was at work so 2019 skill challenge will be learning and developing those skills. Any pointers on techniques or materials welcome Link to post Share on other sites More sharing options...
enginelane Posted January 1, 2019 Author Share Posted January 1, 2019 (edited) Created a simplified drawing to help create the end pieces as unthinkable will cast the main body and end pieces separately. Created a simplified drawing to help create the end pieces as thinking will cast the main body and end pieces separately. Edited January 1, 2019 by enginelane Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now