Jump to content
 

Rob Pulham's 7mm Workbench - Back to the LNER 06 (MOK 8F)


Recommended Posts

  • 1 month later...

A Happy New Year to all.

 
First a bit of  a refresher, those with long memories can skip over this bit.
 
About 8 years ago my good lady became ill and had to give up work. She was fortunate in that she was able to take redundancy and she spent some her redundancy money on a kit for me. I chose the MOK 8F - MOK = Modern Outline Kits available from here MOK
 
I wanted the 8F to build as one of the locos that were ordered by the LNER during the war. My initial plan was to build one of the examples built by the Southern Railway for the LNER but further research since has changed that to become one of those built by the LNER at Darlington. You might ask why - because I wanted a riveted tender and I had already bought spoked wheels. 

The ones built by the Southern had welded (smooth sided) tenders and most of the LNER built examples had solid wheels as on the tenders of the A3/4's but at least a couple of the Darlington examples had spoked wheels to go with the riveted tender. So mine will now be either 3135 or 3144

Rather embarrassingly I started it around 6 years or more ago and never got anywhere near finishing it. About 18 months ago I had a second bash but still didn't even get the tender finished. Chris has been pointedly asking most of this year when I am going to finish it and I had planned to return to it when I got distracted by the J79 in October. So I made the promise that I would return to it over Christmas and endeavour to get it completed.

I thought I would ease back into it with something easy, or so I thought. I started on detailing the backhead a week last Saturday.
 
These are some of the many parts that make it up.
 
39399254232_a60077b7c0_b.jpg

25559503828_893d0cb7ed_b.jpg

I had to make this up from a couple of pieces and I drilled and soldered a spigot to the back to make it easier to attach to the backhead itself.
 
39399253672_ff6d76f226_b.jpg

25559503358_edb997c164_b.jpg

Then the myriad of spaghetti that will be the pipework.

24563468667_cc1da7dc7a_b.jpg

Having seen Nick Dunhill's masterpiece a few weeks back I was keen to replicate the gauge glasses that he did. On this particular backhead this entailed cutting off the levers, and then cutting out the rectangle of brass to insert the square perspex later in the build and then reattaching the levers to the sides.

27657578459_11ccfa3f3b_b.jpg
38556735605_bf2c704b8c_b.jpg


These are the almost finished article that has taken just over a week to put together. - Most of the parts are removable to allow the backhead to be painted.
 
Because there are a few much better builds than mine on the forum I am not going to go into the level of detail that I might do normally but just show the key stages as I complete them - the main goal is to get it finished.
Link to post
Share on other sites

 

Because there are a few much better builds than mine on the forum I am not going to go into the level of detail that I might do normally but just show the key stages as I complete them - the main goal is to get it finished.

 

 

Hi Rob,

Don't do yourself down mate. Let's see the whole build.

 

Fantastic work on the back plate. Neat idea making the details detachable for painting.

 

Cheers,

Peter

Link to post
Share on other sites

Rob,

The back head looks very impressive with all the fittings and pipes. Just as a note though, the extension at the RH side of the main manifold, including the shut off cock with the square headed spindle and the pipes down the back head, are for steam heating and should not be present on an 8F. This is confirmed by pipe and rod drawings and a good photograph in the Wild Swan profile book for the 8F's.

Dave.

Link to post
Share on other sites

Rob,

The back head looks very impressive with all the fittings and pipes. Just as a note though, the extension at the RH side of the main manifold, including the shut off cock with the square headed spindle and the pipes down the back head, are for steam heating and should not be present on an 8F. This is confirmed by pipe and rod drawings and a good photograph in the Wild Swan profile book for the 8F's.

Dave.

 

Hi Dave,

 

I had just noted that photo in the Wild Swan book myself last night. I was pondering on what the extra pipework would have been for and had come to the conclusion that it might be for something BR related which is after the time that I am modelling. You have further confirmed that. Many thanks

 

The good news for me is that the way that I have built it should make it fairly easy to remove the extra pipework.

Link to post
Share on other sites

 

I am having a little more one step forward and two back with this build and it’s my own silly fault. In my eagerness to crack on I hadn’t noticed a photo in the Wild Swan LMS Loco profiles book on the 8F’s that shows the inside of the cab and more importantly the backhead.  - see Dave Hol's post above. 

 

I am thanking myself in that I took the extra time and effort to make most of the parts removable because that will make redoing it much easier.

 

This shows how the parts are removable

 

IMG_7203.jpg

 

 

Below is a crop of the cab photo in the Wild Swan book. The photo is credited to the National Railway Museum and is used here purely to illustrate the differences between what I have done and what I should have done.

 

Cab-Layout-cropped.jpg

Link to post
Share on other sites

Although there are glaring gaps in the instructions, one part is explicit, that of forming the smokebox and boiler. 

The boiler comes pre rolled and according to the instructions so does the smokebox inner but mine wasn't. That wasn't an issue and I soon had it rolled. 

Now for the 'I'm a dummy' bit, the instructions are quite explicit about using two of the formers for the x71 and x72 (sorry I can't remember if the preceding number is 1 or 3). Leaving x70 to go in the smaller end of the boiler. Because they all look identical (but aren't Grrr) I managed to pick up the wrong one and only discovered my error when I had it all nicely soldered together.

My only saving grace was that I discovered the error (part x70 is slightly bigger than x71/x72) before I soldered the other wrong bit (x70) into the smokebox). At 11:15 on Tuesday night I didn't have the headspace to sort it out so I went to bed. 


This morning I set to and using a pointed scalpel and gentle heat from the micro flame I slowly worked my way around easing the boiler away from the former with regular quenching to take it out and replace it with part x70. 


Thankfully I got away with it, in part I think due to the fact that I had soldered it in initially using the microflame to chase around a tiny amount of solder which meant that although it was held very securely it was easy to break the bond from the thin layer of solder. 
 
This is the boiler and smokebox assembly after my recovery.
 
39471916592_1e2beaa21a_b.jpg

Those with sharp eyes will not the piece of scrap protruding from the front of the smokebox.
 
39501698161_65fc39cbd8_b.jpg
 
There is a clever bit of the etch designed to ensure that you get everything lined up by inserting a piece of scrap into a slot etched into each of the three forward formers
 
39501699121_e5df17f73e_b.jpg
 
I left it longer than suggested and used it to view down through all the apertures in the boiler top. In fact I left it in place as I soldered on the castings on top of the boiler. To solder these cleanly I flattened a couple of small bit's of 145 solder in some pliers, placed them either side of the chimney opening after using a taper broach to open the hole up to take the spigot from the casting as tightish fit. a squirt of flux and then I place the chimney on top ensuring that it was square I heated the casting with the microflame until the solder melted allowing the casting to sink into place. - Repeated for the next casting (which I have to be honest and say I have no idea of the name or purpose of it).
 
At this point the Firebox, boiler and smoke box are all a nice tight push fit I won't make it more permanent until I am happy with everything.
 
Finally, I had fitted the cab roof on Tuesday but I still need to sort out the subframe under the floor.
 
39471915472_326ce40342_b.jpg

39501696751_590b1b6348_b.jpg
Link to post
Share on other sites

Mind the Gap, the age old saying on the railways.
 
Mine was a little more fundamental - the curve of the footplate under the cab was not anything like the curve of the cab sides
 
39415960522_39aa073f09_b.jpg
 
24580297057_3a7b4a9793_b.jpg
 
24580297497_6921dc321b_b.jpg

 
Because I didn't have the benefit of the updated instructions that Mark kindly shared with me after and enquiry over on Western Thunder (I have emailed Dave Sharp to ask for a set of the updated instructions) I had previously added the cab front overlays and soldered all around the seams. This meant that tucking the front of the curved section up under the top layer of the cab front as advised in the updated instructions wasn't to my mind - I worked on the theory that if I tried to remove the thin overlay I would irreparably damage it.
 
That left the alternative which was cut/file the front section down so that it sits just below the footplate rather than tucked in behind the front plate and to desolder and file down the sub frames until the curve better matched that of the sides of the cab.
 
27741330189_282565a6f0_b.jpg
 
As you are looking at it, it took two goes at desoldering, filing down, before resoldering to test the fit for the left hand subframe and six goes for the right hand subframe.  At each desoldering I carefully cleaned up before filing a little more off. You may wonder why I resoldered at each test, it was because I couldn't hold it in close enough proximity to accurately check the fit when trying to hold all the parts while they were 
 
I have to say that had I continued with the build to this point when I started back in 2011 or so, I would never have had the confidence to desolder and resolder the same part so many times to get the fit that I wanted. I would never have been happy with it either.
 
39485697262_2eb516fe49_b.jpg
 
 
39485697752_dc84f4cbb2_b.jpg

39485696882_1dd6d93a82_b.jpg


The slight gap on the right hand in this view will close up when I solder it all in but I am triple checking all is right before taking the final step.
Link to post
Share on other sites

Further work over the weekend has seen it start to look like a loco at long last.
 
38870309054_59107d23f6_b.jpg

39549431202_e3a0c07778_b.jpg

38870307844_80b38a0bef_b.jpg

39549430252_19fb11287b_b.jpg

At the moment all except the cab, the reversing lever and it's housing are just sat in place and are held by the firm fit of the components. - The sand shields are just lent in place because I need to drill them yet for the sandbox fillers. 
I am slightly surprised that they don't have at least some semblance of a hole etched in them given how well everything else is portrayed. 
 
I also need to drill and put a self tapper in the top of the cab face of the firebox to close up the very slight gap on the drivers side before I solder it in place. The instructions suggest doing this but I thought that I had got away without the need until I put everything in place.
Link to post
Share on other sites

  • 3 weeks later...

Warren Haywood kindly dropped off my J79 on Tuesday evening having weaved his magic on the paint job. I need to glaze it add the backhead etc.

 
Having checked my reference books I also need to add the loco number the the front buffer beam - neither of us were certain it had one when Warren was doing it and I only checked after the event.
 
 
39846314052_1c9bcd8ac6_b.jpg

 
38979567285_9ebffefc00_b.jpg

 
25007207147_1820261e3e_b.jpg
Link to post
Share on other sites

Hi Rob,

You made a nice job of that, and Warren's paint job is the icing on the cake. Any reason why you haven't trimmed the 12 BA bolts on the crankpins, or is that on the "to do" list?

 

Cheers,

Peter

Link to post
Share on other sites

  • 4 weeks later...
Although I have made some progress on the chassis, recent minor surgery on my toe has left me struggling with the time/energy to give this the thought that it needs to get the motion assembled so I have been doing a few small jobs on the J6 until my energy returns

 

38524621000_2f82b39594_b.jpg[/url]

 

38524620280_64086d5165_b.jpg

 

39436389615_3bfc14a0e7_b.jpg[/url]

Link to post
Share on other sites

  • 1 month later...
A few days off over Easter saw me make further progress on the 06. 
 
Shaping the curves of the inner tender sides was interesting because in my ignorance I had chopped off one end of the etch which contained the marked etched bend lines and although I still had the piece that I removed I couldn't realistically realign it. So some careful measuring was in order.
 
I annealed the tops of the sides where the main bend was to be - I did this a couple of times during the process.
 
40448756705_b2e18bda6a_b.jpg

27472575608_56f4ce0f2d_b.jpg

40630798134_28db5518c4_b.jpg

40589328194_6d43fcb24b_b.jpg

In order to bend the front curves of the tender sides which were very close to the half etched line for the location of the front bulkhead I soldered in a couple of strips of scrap to stop it bending on the half etched line instead of where I wanted it to.
 
Once happy I soldered in the rear bulkhead and started to add details.
 
40448754715_9ba694c633_b.jpg
Link to post
Share on other sites

Before going any further I started to make up the bulkheads which are made up from multiple layers. Here the instructions (or my interpretation of them) let me down again and I managed to get the overlay for the top of the front bulkhead out of sequence meaning that I had to cut a section out of it to prevent having to undo a lot of work meaning that it sits around the lockers not behind them (it was quite easy to do with scissors due to it being half etched). It isn't visible in the end result but I know I had to do it.

 

Front Bulkhead

 

39493537700_50571b19f0_b.jpg

 

40589322844_7757960f0f_b.jpg

 

Fire Iron Tunnel

 

27472584268_90cd03c8a8_b.jpg

 

27472582628_51aaa3ec48_b.jpg

Link to post
Share on other sites

This is what it looks like with the overlays on the body. You get two options included in the kit either welded or riveted. I chose riveted because it adds a little more to the character. 
 
40676872634_5a63d35724_b.jpg

27521178578_7cb33068db_b.jpg

40676871344_48a2eb9320_b.jpg
 
These latter two show the front bulkhead now it's fitted and the fire iron tunnel which fitted perfectly.

27521177568_b4ef557d3b_b.jpg

40676870324_51534a4f54_b.jpg
Link to post
Share on other sites

  • 1 month later...
I had a very satisfying session on Friday afternoon finishing of fitting the pickups and getting the J79 for a run out at Shildon on Saturday. After a couple of minor hiccups including a crank pin bush and a wheel retaining stud coming undone she ran successfully in both directions. I do need to look at my springing of the centre axle though as there didn't seem to be any movement at all.

 


 

I took along a couple of items of rolling stock for a run out too - Connoisseur Midland Milk van and a Dragon S&D Horsebox.

 


Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.


×
×
  • Create New...