Hills and Meadows - N-gauge


Maurits71
 Share

Recommended Posts


warning with thanks to Photobucket who has recently changed their policy all my images are no longer visible. I have moved them to Flickr but I am not sure if I can restore all image links, so if please visit my flickr photo book for all images

 


 

Hi all.

 

after a too long break after Highbury Fields the house move is done, most of the boxes unpacked so time for a new project. and I think I can say as complicated as the previous one but almost twice the size 350 metres in total.

 

What is planned. 3 fiddle/ stacking yards. the main one can stock 35 long or 50 short. a 6+2 track main station, a shunting yard with TMD and a 4 track main line all on 3 layers. Ssame as Highbury Fields not a specific area it's still rule 1 although there will be some ECML influences.

 

Hills%20and%20meadows.jpg

 

I had already ordered all the wood work which I could pick up today.

 

20150214_100438427_iOS.jpg

 

also the back scenes are in house, special thanks to John from art-printers who has done a sort of special commissioned job for me as the design I wanted wasn't available in 40 ft. so that's the first project I will do attached board on the walls for the back scenes.

 

as I will have rond corners I have made a little tool which will also help making nice smooth bends, smallest one is peco r3 up to ...

 

20150214_155108074_iOS.jpg

 

and after some diy you get this

 

20150214_172503187_iOS.jpg

 

always smooth nice corners.

 

this is the train room, still some boxes to do although most of the boxes are train stuff.

 

best regards

 

Maurits

Edited by Maurits71
  • Like 5
Link to post
Share on other sites

well that's was the Sunday gone, had planned to do most of the back scene boards but with a female ambulance in house shouting do this, do that all the time it didn't went completely as planned

 

so happy to manage at least 2 of them done.

 

20150215_183224961_iOS.jpg

 

next week I have got the family over from Holland so with a bit of luck I can hide myself with my dad in the train room :)

 

will keep you guys posted

 

M.

  • Like 2
Link to post
Share on other sites

Well that was a very busy week gone, firstly visiting customers in Cornwall, Devon for four days, Saturday the Princess Risborough show with Horsely Fields so finally today some me time.

 

as my parents are over from Holland I had an extra pair of hands which was very useful.

 

so firstly we have finished the back boards till the full 10 metres length

 

20150222_064941611_iOS.jpg

 

 

 

painting was the next job.

 

20150222_125719266_iOS.jpg

 

and after the paint was dry we have started with the first of 8 back - scenes.

 

20150222_203626121_iOS.jpg

 

we have also started with the top shelving/ light bar which also needs to be finished first before we can start with the construction of the layout.

 

This week most nights home so for sure some building time

 

best regards

 

M.

Edited by Maurits71
  • Like 5
Link to post
Share on other sites

Well can say had a few good hours with my dad the last 2 nights, all back scenes done, storage/ light hood finished

 

20150223_213751634_iOS.jpg

 

 

 

20150224_171356454_iOS.jpg

 

almost there

 

20150224_182109572_iOS.jpg

 

and with the first led tube, nice and bright light

 

20150224_184820941_iOS.jpg

 

next stage, the construction of the layout

 

M.

  • Like 6
Link to post
Share on other sites

Hi All.

 

done a bit more work tonight

 

the light cover is more or less done now, only a small bit to do but need to get some more board. have decided to go for a bit of a finishing touch, nobody is going to see it but it looks just a bit better

 

20150226_185657366_iOS.jpg

 

also the second and third led tubes are placed, looks that it's more than enough light.

 

20150226_185711205_iOS.jpg

 

and the fist part of the base board, level 1 at 55 cm height

 

20150225_192531612_iOS.jpg

 

I had a small wish to see the first train this weekend but don't think it's going to happen, the things to do list is still big.

 

best regards

 

Maurits

  • Like 3
Link to post
Share on other sites

Hi all.

 

small update, the base for the lowest stack yard is more or less finished, 

 

20150228_201543000_iOS.jpg

 

I was intending to have a small desk aswell so I could do some modeling whilst watching trains, it's a bit tight so something still to consider.

 

20150228_201609718_iOS.jpg

 

best regards,

 

M.

  • Like 8
Link to post
Share on other sites

Not a lot to report, have been away all week but have found a bit of time to connect al boosters

 

20150305_201332300_iOS.jpg

 

this should be enough for at least 40 simultaneous running trains which should be more than sufficient.

 

hopefully some track laying this weekend

 

best regards

 

Maurits

Edited by Maurits71
  • Like 4
Link to post
Share on other sites

 

Have been quit productive today, my little home made tool is doing the job and gives me lovely curves

 

20150307_160006977_iOS.jpg

 

And after a couple of hours I have connected the first pieces of track and a first test run with my latest addition a class 37 in DRS with some German Double deckers as these are perfect to see if the distance between the track wide enough is. Despite being 30mm is't quit close but enough

 

20150307_194308000_iOS.jpg

 

tomorrow another day

 

Maurits

Edited by Maurits71
  • Like 10
Link to post
Share on other sites

Evening all

 

A small midweek update, have done a few bits over the last couple of nights.

 

laid down the second set of points, laid the 2 tracks towards the second helix and connected the first 2 full tracks of the fiddle yard, another 8 to go with around 16 metres of track.

 

once done my favourite work ( not ) droppers, points and all detection decoders which will be quit a task to get this done properly.

 

 

 

20150311_193626836_iOS.jpg

 

20150311_193633581_iOS.jpg

 

20150311_193638783_iOS.jpg

 

speak soon, Maurits

  • Like 10
Link to post
Share on other sites

 :D  :D  :D  :D  :D  :D 

 

20150313_192405347_iOS.jpg

 

20150313_192411407_iOS.jpg

 

20150313_192420545_iOS.jpg

 

fase 1 finished. next fase, servo's, decoders en soldering

 

Don't expect any progress soon as we are entering a long trial and error period, who has followed Highbury Fields has seen that I was struggling with space and a correct flow. The way I have done the fiddle yard now should solve the flow problems and shout give me space for an average of 30 trains. to get this done I have in mind to get small sections of 100 cm each. so a 2 coach HST is 60 cm that's one section. a freight train is 200 cm means 2 sections occupied. so this is something I am trying to achieve over the next couple of weeks or months what ever it takes and once's the computer deals with the fiddle yard as I have in mind I will start building the helixen.

 

will post a video once I can run a full loop

 

M.

  • Like 8
Link to post
Share on other sites

evening all.

 

have had some fun with soldering droppers, connecting points and power reverse modules.

 

the first 13 sections are connected and I have had my first test night with 2 loco's completely computer controlled. so far my ideas and thoughts are working.

 

20150317_212030806_iOS.jpg

 

trains are able to make one full loop tomorrow I will connect track of the fiddle yard and than I should me able to test with 8 trains.

 

best regards, Maurits

  • Like 6
Link to post
Share on other sites

Happy Sunday.

 

Have wired up the whole fiddle yard now, 47 sections in total

 


 


 

everything is also already sorted in the computer so this afternoon it's play ( test ) time, see what's max I can get out of this fiddle yard

 

best regards.

 

M.

  • Like 1
Link to post
Share on other sites

Wow, what a superb room, layout and design!!

 

I don't look at N gauge layouts too often but this caught my eye and looks fantastic already! I take it you've been building model railways for some time considering how quickly you've progressed with this and how complex the track plan looks!!

 

Can't wait to see some more updates!

Link to post
Share on other sites

 

Had a nice test ' play ' night last night. One of the points didn't do the job properly so I have added some more droppers and that seems to do the job. Fiddle yard is filled now with 27 trains between 70 and 150 cm. I can add 4 x 150 cm extra but will not do this till exit 3 and 4 are finished otherwise it's a serious traffic jam.

 

this is how it looks with 20 trains

 

 

 

20150323_210618254_iOS.jpg

 

and still space   :)

 

20150323_201756143_iOS.jpg

 

20150323_201549337_iOS.jpg

 

20150323_211112424_iOS.jpg

 

will keep on testing the next couple of days before I will start with the rest of the layout.

Edited by Maurits71
  • Like 7
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...