Maurits71 Posted February 14, 2015 Share Posted February 14, 2015 (edited) warning with thanks to Photobucket who has recently changed their policy all my images are no longer visible. I have moved them to Flickr but I am not sure if I can restore all image links, so if please visit my flickr photo book for all images Hi all. after a too long break after Highbury Fields the house move is done, most of the boxes unpacked so time for a new project. and I think I can say as complicated as the previous one but almost twice the size 350 metres in total. What is planned. 3 fiddle/ stacking yards. the main one can stock 35 long or 50 short. a 6+2 track main station, a shunting yard with TMD and a 4 track main line all on 3 layers. Ssame as Highbury Fields not a specific area it's still rule 1 although there will be some ECML influences. I had already ordered all the wood work which I could pick up today. also the back scenes are in house, special thanks to John from art-printers who has done a sort of special commissioned job for me as the design I wanted wasn't available in 40 ft. so that's the first project I will do attached board on the walls for the back scenes. as I will have rond corners I have made a little tool which will also help making nice smooth bends, smallest one is peco r3 up to ... and after some diy you get this always smooth nice corners. this is the train room, still some boxes to do although most of the boxes are train stuff. best regards Maurits Edited July 2, 2017 by Maurits71 5 Link to post Share on other sites More sharing options...
Guest bri.s Posted February 15, 2015 Share Posted February 15, 2015 Wow That is one hell of a plan and pile of wood lol looking forward to your progress Brian Link to post Share on other sites More sharing options...
Maurits71 Posted February 15, 2015 Author Share Posted February 15, 2015 well that's was the Sunday gone, had planned to do most of the back scene boards but with a female ambulance in house shouting do this, do that all the time it didn't went completely as planned so happy to manage at least 2 of them done. next week I have got the family over from Holland so with a bit of luck I can hide myself with my dad in the train room will keep you guys posted M. 2 Link to post Share on other sites More sharing options...
Maurits71 Posted February 22, 2015 Author Share Posted February 22, 2015 (edited) Well that was a very busy week gone, firstly visiting customers in Cornwall, Devon for four days, Saturday the Princess Risborough show with Horsely Fields so finally today some me time. as my parents are over from Holland I had an extra pair of hands which was very useful. so firstly we have finished the back boards till the full 10 metres length painting was the next job. and after the paint was dry we have started with the first of 8 back - scenes. we have also started with the top shelving/ light bar which also needs to be finished first before we can start with the construction of the layout. This week most nights home so for sure some building time best regards M. Edited February 25, 2015 by Maurits71 5 Link to post Share on other sites More sharing options...
Maurits71 Posted February 24, 2015 Author Share Posted February 24, 2015 Well can say had a few good hours with my dad the last 2 nights, all back scenes done, storage/ light hood finished almost there and with the first led tube, nice and bright light next stage, the construction of the layout M. 6 Link to post Share on other sites More sharing options...
Maurits71 Posted February 26, 2015 Author Share Posted February 26, 2015 Hi All. done a bit more work tonight the light cover is more or less done now, only a small bit to do but need to get some more board. have decided to go for a bit of a finishing touch, nobody is going to see it but it looks just a bit better also the second and third led tubes are placed, looks that it's more than enough light. and the fist part of the base board, level 1 at 55 cm height I had a small wish to see the first train this weekend but don't think it's going to happen, the things to do list is still big. best regards Maurits 3 Link to post Share on other sites More sharing options...
Maurits71 Posted February 28, 2015 Author Share Posted February 28, 2015 Hi all. small update, the base for the lowest stack yard is more or less finished, I was intending to have a small desk aswell so I could do some modeling whilst watching trains, it's a bit tight so something still to consider. best regards, M. 8 Link to post Share on other sites More sharing options...
Maurits71 Posted March 5, 2015 Author Share Posted March 5, 2015 (edited) Not a lot to report, have been away all week but have found a bit of time to connect al boosters this should be enough for at least 40 simultaneous running trains which should be more than sufficient. hopefully some track laying this weekend best regards Maurits Edited March 5, 2015 by Maurits71 4 Link to post Share on other sites More sharing options...
Maurits71 Posted March 7, 2015 Author Share Posted March 7, 2015 (edited) Have been quit productive today, my little home made tool is doing the job and gives me lovely curves And after a couple of hours I have connected the first pieces of track and a first test run with my latest addition a class 37 in DRS with some German Double deckers as these are perfect to see if the distance between the track wide enough is. Despite being 30mm is't quit close but enough tomorrow another day Maurits Edited March 8, 2015 by Maurits71 10 Link to post Share on other sites More sharing options...
Maurits71 Posted March 9, 2015 Author Share Posted March 9, 2015 (edited) Another 18 metres and 7 points, 7 points and 100 metres of track to go before the fiddle yard is finished Best regards Maurits Edited March 9, 2015 by Maurits71 6 Link to post Share on other sites More sharing options...
Maurits71 Posted March 11, 2015 Author Share Posted March 11, 2015 Evening all A small midweek update, have done a few bits over the last couple of nights. laid down the second set of points, laid the 2 tracks towards the second helix and connected the first 2 full tracks of the fiddle yard, another 8 to go with around 16 metres of track. once done my favourite work ( not ) droppers, points and all detection decoders which will be quit a task to get this done properly. speak soon, Maurits 10 Link to post Share on other sites More sharing options...
Gloucester Road Posted March 11, 2015 Share Posted March 11, 2015 Another nice looking project. Really like the brightness and how crisp the backdrop is 1 Link to post Share on other sites More sharing options...
Maurits71 Posted March 13, 2015 Author Share Posted March 13, 2015 fase 1 finished. next fase, servo's, decoders en soldering Don't expect any progress soon as we are entering a long trial and error period, who has followed Highbury Fields has seen that I was struggling with space and a correct flow. The way I have done the fiddle yard now should solve the flow problems and shout give me space for an average of 30 trains. to get this done I have in mind to get small sections of 100 cm each. so a 2 coach HST is 60 cm that's one section. a freight train is 200 cm means 2 sections occupied. so this is something I am trying to achieve over the next couple of weeks or months what ever it takes and once's the computer deals with the fiddle yard as I have in mind I will start building the helixen. will post a video once I can run a full loop M. 8 Link to post Share on other sites More sharing options...
RMweb Gold Revolution Ben Posted March 13, 2015 RMweb Gold Share Posted March 13, 2015 Hi Maurits, Thanks for posting. This scheme is heroic in its scope and, so far, superb in its execution. I have every confidence that you will find a solution to the control issues you've identified. cheers Ben A. Link to post Share on other sites More sharing options...
Gloucester Road Posted March 13, 2015 Share Posted March 13, 2015 wow that is an impresive amount of track and scheme. Link to post Share on other sites More sharing options...
Maurits71 Posted March 13, 2015 Author Share Posted March 13, 2015 thanks Ben. I am confident to, it's not the first one I am building and Highbury Fields was a good learning curve. at the end Link to post Share on other sites More sharing options...
Maurits71 Posted March 17, 2015 Author Share Posted March 17, 2015 evening all. have had some fun with soldering droppers, connecting points and power reverse modules. the first 13 sections are connected and I have had my first test night with 2 loco's completely computer controlled. so far my ideas and thoughts are working. trains are able to make one full loop tomorrow I will connect track of the fiddle yard and than I should me able to test with 8 trains. best regards, Maurits 6 Link to post Share on other sites More sharing options...
Guest bri.s Posted March 17, 2015 Share Posted March 17, 2015 Wow you work fast , Glad you've got it working Look forward to your progress Link to post Share on other sites More sharing options...
Maurits71 Posted March 21, 2015 Author Share Posted March 21, 2015 Happy Saturday all. have done lots of running last 2 days do time for a little first movie a few minor tweaks to do but really pleased so far M. 7 Link to post Share on other sites More sharing options...
Mr Pix Posted March 21, 2015 Share Posted March 21, 2015 Hi Maurits..... Looking forward to see how you progress with this project, great work and very impressive. Jez Link to post Share on other sites More sharing options...
Maurits71 Posted March 22, 2015 Author Share Posted March 22, 2015 Happy Sunday. Have wired up the whole fiddle yard now, 47 sections in total http://i31.photobucket.com/albums/c353/MJCMonique/1-Millbrook%20Meadows%20model%20rail%20way/20150321_191501899_iOS.jpg[/img] http://i31.photobucket.com/albums/c353/MJCMonique/1-Millbrook%20Meadows%20model%20rail%20way/20150321_191509605_iOS.jpg[/img] everything is also already sorted in the computer so this afternoon it's play ( test ) time, see what's max I can get out of this fiddle yard best regards. M. 1 Link to post Share on other sites More sharing options...
topsy11 Posted March 22, 2015 Share Posted March 22, 2015 Wow, what a superb room, layout and design!! I don't look at N gauge layouts too often but this caught my eye and looks fantastic already! I take it you've been building model railways for some time considering how quickly you've progressed with this and how complex the track plan looks!! Can't wait to see some more updates! Link to post Share on other sites More sharing options...
Maurits71 Posted March 24, 2015 Author Share Posted March 24, 2015 (edited) Had a nice test ' play ' night last night. One of the points didn't do the job properly so I have added some more droppers and that seems to do the job. Fiddle yard is filled now with 27 trains between 70 and 150 cm. I can add 4 x 150 cm extra but will not do this till exit 3 and 4 are finished otherwise it's a serious traffic jam. this is how it looks with 20 trains and still space will keep on testing the next couple of days before I will start with the rest of the layout. Edited March 24, 2015 by Maurits71 7 Link to post Share on other sites More sharing options...
RMweb Gold roundhouse Posted March 24, 2015 RMweb Gold Share Posted March 24, 2015 I missed your first posts some how but so far it's looking really good. Will be following now to see how you get on with the computer control. Ian Link to post Share on other sites More sharing options...
D1059 Posted March 24, 2015 Share Posted March 24, 2015 OMG - that's ambitious. Well done, I shall have to keep an eye on this project Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now