Jump to content
 

Hills and Meadows - N-gauge


Maurits71
 Share

Recommended Posts

Afternoon,

 

Want to share a few ideas I have.

 

foot bridge because every p[roper station needs one

 

36571765952_2f3612294a_b.jpg 

 

the station building on one end of the station, will be build based on Sandy Trainstation.

 

36741480685_fbb18d2ca0_b.jpg

 

the other side of the station, likely that I am going to build tunnels underneath the city, this side will also get a small station for the heritage line

 

35932080013_0875613096_b.jpg

 

so to be continued

  • Like 2
Link to post
Share on other sites

  • RMweb Gold

 

Hi Maurits,

 

Nice job. Is the line going to have catenary eventually? If not, then you may want to reduce the height of the footbridge a little. Generally speaking, the height of rail structures would be kept to a safe minimum to minimise costs.

 

See the height of this footbridge at Clapham Junction:

 

https://goo.gl/images/3i1nVR

 

Cheers

 

Ben A.

  • Like 1
Link to post
Share on other sites

  • 3 weeks later...
Evening, the 3 mainlines and the siding have working signals now, need to do the other 2 on the heritage line, just waiting for a delivery from Crsignals. platforms and tunnel are also getting shape. On the pic EMT dmu is just arrived in the siding whilst Class 66 Eddy Stobart passes the station.

 

36391501224_a352f4d1c7_b.jpg

  • Like 4
Link to post
Share on other sites

  • 2 weeks later...
Evening all.

 

Managed to squeeze a few hours into modelling and more specific the entrances. Really happy with the result and must admit it makes a great impact.

 

37388140476_f5c2d0b9c8_b.jpg

 

Weathering is done mainly with the air brush, with a dry white wash as a finish.

 

23583717528_9c48a66c92_b.jpg

 

23583720628_396f001059_b.jpg

 

next job is to build another 12  ;) which will take some time I think.

 

Best regards

 

Maurits

  • Like 6
Link to post
Share on other sites

  • 2 weeks later...
Evening.

 

The biggest fun :hmmm: of a big layout that everything you do you need to do loads, after helixes it's now retaining walls.

 

Not finished yet but looks pretty cool

37836583581_20387b79d7_b.jpg

 

2nd project I am working on at the moment is a corner pub , people who know me know that I have said that I want the majority of the buildings beeing designed and build by my selves instead of buying factory made stuff, the new Cameo I have is in this matter a massive help.

 

So based on this pub in London I have started to design something similar with an extra floor

37578927050_f9242cbd2b_b.jpg

 

and this is what I have achieved so far

 

37804791302_33ce19bd4f_b.jpg

 

Took 2.5 hours to print, on purpose on the slowest setting but really pleased with the outcome

  • Like 2
Link to post
Share on other sites

Evening all,

 

Evening.

 

Have made some good progress the last 2 nights, The pub side is getting shape, now in process of adding details like curtains, will also make an interior for the pub it selves with some light effects likely

 

37877792506_580e9bfc8e_b.jpg

 

I have planned that the front is going to be the most visible part, still not sure why cAFE is spelled with a small c.

 

24079583678_2812dfd600_b.jpg

 

The other side, which as it looks is a complete separate building ( see link below )

 


 

Is printed, took over an hour :), painted and weathered although I am a bit concerned if I haven't overdone it, but  ask me this question later

37877809666_c7bd7ddacb_b.jpg

 

37877799176_6d1d6d7daa_b.jpg

  • Like 2
Link to post
Share on other sites

  • 2 weeks later...
Happy Sunday.

 

For a change I had some time this weekend to give the trains a good run, still suprised that even after a long spell as this time you push the button and all run as they supposed to do.

 

Today started with some home build buffer stops. below shown without lights.

 

37485334444_1a5c09d9fd_b.jpg.

 

And with lights  ;)

 

37485324314_762c3979e3_b.jpg.

 

As I was in the mood also started detailing this stretch, footpath, dummy point motors, cabling etc.

 

 

 

38139922756_6e45caa7a7_b.jpg

 

 

37485330684_abaa890cb6_b.jpg

 

And end of the day a surprise visit from Crispy Bacon Dave who brought me a lot of celotex expanded foam , so de coming weeks and have something to do ;) ;)

  • Like 6
Link to post
Share on other sites

  • 2 weeks later...

Evening,

 

for one reason my whole story with an update on the footbridge went wrong, so here's another try.

 

When passing Harlow the other day I noticed that Harlow train station was actually something i though that it would look great on my layout.

 

so firstly as normally I made a card board mock up.

 

38341386561_8621d033c8_b.jpg

 

after a small chat with a few of my train mates I was convinced that this was the way to go forward so designed my own impression in the silhouette software so that I could print the whole lot.

 

24696870518_cb64a6837d_b.jpg

 

as I always print on the slowest speed it takes a good few hours to print all sheets, but the result is there and assembling could start, this took me a good 20 hours to get the bridge build.

 

24696871228_892d43b27c_b.jpg

 

38512359146_d0a670f4aa_b.jpg

 

24696868528_4e277aef92_b.jpg

 

38537307902_fd1bb1b91a_b.jpg

 

37680688505_19e2954cd9_b.jpg

 

and then finally when this was done it needed a bit of a weathering.

 

38512328966_6a0199d9c8_b.jpg

 

 

before i can completely finish the foot bridge I need to make the canopies, and also I need to weather the track before I can glue the bridge down

 

38572783322_bc5e410b31_b.jpg

 

38572787542_b06a0e60a0_b.jpg

 

37717345545_becc3f6c7d_b.jpg

  • Like 3
Link to post
Share on other sites

  • 3 weeks later...
Happy Saturday all,

 

Have had 2 air brush sessions this week to paints track/ ballast and another night for cleaning the tracks so was quit busy and a mesh. but did a good running session last night almost 1200 kilometers in a couple of hours without any major failures so pleased.

 

spend today on the first of four canopies, as mentioned station is build with Harlow in mind which I have adapted to my own liking. 

 

38222183894_3cf3a6781d_b.jpg

 

3 more to go :)

 

 

best regards, Maurits

  • Like 3
Link to post
Share on other sites

Happy Sunday all.

 

despite the snow here read playing outside with the kids I have managed to do a bit more. was looking at some pictures yesterday of Harlow station and decided that it would look better if I had on boh sides of the bridge canopies, and with number 1 finished it looks indeed much better.

 

38969991061_942846ae31_b.jpg

 

38253660534_de6043b81c_b.jpg

 

38933305332_b979d12991_b.jpg

 

so hopefully I can find some time to get the others done.

  • Like 5
Link to post
Share on other sites

Happy Saturday.

 

Done some details over the last couple of days, AWS ramps now placed at the correct distance of a signal

 

27298802719_7cb3a39325_b.jpg

 

Axel counters are apparently normally placed in pairs so I had to add a few

 

27308875129_f46b023962_b.jpg

 

also did a good few hours last night without any major issues, so had an opportunity to shoot some video's, just click on the picture.

 


  • Like 3
Link to post
Share on other sites

  • 5 weeks later...
Thank you all for the kind words.

 

Although I am aware I haven't done an update here ( yes I know I have done lots on face book ), quite a few jobs are done and pending.

 

Main current Job is to cover helix number 5, from all the most ackward one to do, down to the fact it's difficult to get there, second, it's much higher than the surrounding parts of the layout.  Walking the dog a while ago around Sandy radio tower I thought that was the solution for this part as it's grass land and a quarry. not that I am going to build a quarry ( ermmm yes I am going toactually but not on Hills and Meadows, ) it justifies some rocks . so below in the pictures the progress sofar.

 

first trial

 

38981576704_6271c76e9d_b.jpg

 

Rocks are made from plaster of Parish and painted , I have looked a lot of youtube videos so it's basically following what these guys are doing

 

38981573714_eb54db1c33_b.jpg

 

38981570264_789d093d25_b.jpg

 

25818163728_fbf687427b_b.jpg

 

Once dried and painted I have used sculptamold to cover the lower area's first time I have used this product and think it's great.

 

38981566544_a9af52869f_b.jpg

 

Takes a while to dry and once dry I have painted everything with creap brown paint, air brushed the surroundings around the rocks.

 

38981558684_d2463bf9c3_b.jpg

 

Started with static grass today which will continue over the next couple of days. 

 

38981562154_f249d8c6fb_b.jpg

 

The 4 houses you can see in the first picture are almost done and will start on the Radio tower hopefully after the =Canterbury show.

  • Like 2
Link to post
Share on other sites

Happy Friday all,

 

productive few days and really like this kind of work down to the fact that you can result within minutes. Used the air brush first to create shadows around the rocks and to high lite the foot pads. 

 

Once this is dry the fun started, static grass.

 

24914069607_bfa5ee8e90_b.jpg

 

The trick with static grass is firstly a proper unit, I am using the flock it unit bought from the green scene, secondly take your time.

 

24914070367_8902f49d59_b.jpg

 

I normally leave it overnight to dry before I am going to hover all the excess.

 

on the picture you can see the difference between the work I did yesterday and today

 

39074021704_c08cb481bc_b.jpg

 

24914066487_3fb4c25383_b.jpg

 

next step is a second layer with 2 mm grass in a darker colour around the edges before I can start adding bushes and trees.

 

39752496652_0d49957073_b.jpg

 

Best regards, Maurits

  • Like 3
Link to post
Share on other sites

  • 1 month later...
Evening all.

 

despite the lack of updates I have done quite a lot recently

 

Finished the 3 houses, small little jobs left like the gardens and fences, lights are fitted but not connected yet.

 

40597756681_ee903d53d5_b.jpg

 

Second big job was to make my own impression of Sandy heath radio transmitter using brass. not scaled otherwise it wouldn't fit but it looks alright

 

25727307457_60fc213ef5_b.jpg[/url]

 

As people might be aware I can see the radio transmitter from my study and like in real it's a massive thing

 

40597753681_cf4c92dac7_b.jpg

 

Like the real thing it has got the 5 red lights you can see from miles and miles away

 

39702916865_9669cba44c_b.jpg

  • Like 5
Link to post
Share on other sites

  • 2 weeks later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...