Jump to content
 

Northwick a oo gauge layout by Twickenham & District MRC


Northwick Group
 Share

Recommended Posts

Last Friday was the first running night of the year for northwick and as usual there was a theme with Terriers & pre-grouping stock being chosen. Here are some pictures of what was running.

 

39732256462_8ed5fc247b_c.jpg

38865144525_75a29ba208_c.jpg

27985525469_f651372c8e_c.jpg

27985525999_6de319e1c6_c.jpg

39732257912_0cb3ddd7b7_c.jpg

27985527069_258895259d_c.jpg

39054480734_21c22db089_c.jpg

24894311037_ae39380474_c.jpg

27985528499_f059066172_c.jpg

39764227981_5bdb77e99a_c.jpg

27985526849_5047d553b2_c.jpg

39732258342_529449b044_c.jpg

27985524989_9903009191_c.jpg

 

And keeping with tradition we lined up all of the terriers at the end of the night (all 16 of them in case you were wondering)

 

39054481604_e74a0c4b46_c.jpg

  • Like 5
Link to post
Share on other sites

  • 4 weeks later...

over the past couple of weeks we have been busy adjusting the second trench as we have now got a find to put in the bottom of the ditch, this will be a skeleton that is being uncovered. this resulted in the whole of the previous trench being dug up and then widened so that we could insert the skeleton, as pictured below.

 

39576500034_fe4e9d144f_c.jpg

 

it was then time to build up the surface so that the skeleton would be buried in the ditch, this had to be done in 2 steps due to the thickness of the vermiculite mixture required.

 

26415020958_44b1ce53ac_c.jpg

40242541012_f698752a84_c.jpg

 

The first layer of soil has now been added, a second layer will be required to cover up any remaining patches that may show through, after this the area that the ditch is will be darkened down so that it will show up like it would in real life.

 

26415021448_84dde51b1a_c.jpg

 

We have also been paying some attention to the cattle dock/ end unloading area the main focus at the moment has been to cut a hole in the wall of the end unloading ramp so that the couplings of the wagons will pass through is which then enables the buffers to touch the wall and so creating a far more realistic gap as shown in the pictures below.

 

39390593805_c7374fb8db_c.jpg

39390593475_3bf4f736cf_c.jpg

26415478868_4e31daed29_c.jpg

 

and to show that it works we put the only road vehicle that we could find on the ramp being loaded.

 

38478188900_c64a529e50_c.jpg

25416785917_2f1160abff_c.jpg

 

the hole in the wall has since had the edges painted black and a strip of wood has been added above to act as the buffer beam, I would include a picture but i can't find id at the moment.

 

 

 

  • Like 2
Link to post
Share on other sites

over the past couple of weeks we have been busy adjusting the second trench as we have now got a find to put in the bottom of the ditch, this will be a skeleton that is being uncovered. this resulted in the whole of the previous trench being dug up and then widened so that we could insert the skeleton, as pictured below.

 

39576500034_fe4e9d144f_c.jpg

 

it was then time to build up the surface so that the skeleton would be buried in the ditch, this had to be done in 2 steps due to the thickness of the vermiculite mixture required.

 

26415020958_44b1ce53ac_c.jpg

40242541012_f698752a84_c.jpg

 

The first layer of soil has now been added, a second layer will be required to cover up any remaining patches that may show through, after this the area that the ditch is will be darkened down so that it will show up like it would in real life.

 

26415021448_84dde51b1a_c.jpg

 

We have also been paying some attention to the cattle dock/ end unloading area the main focus at the moment has been to cut a hole in the wall of the end unloading ramp so that the couplings of the wagons will pass through is which then enables the buffers to touch the wall and so creating a far more realistic gap as shown in the pictures below.

 

39390593805_c7374fb8db_c.jpg

39390593475_3bf4f736cf_c.jpg

26415478868_4e31daed29_c.jpg

 

and to show that it works we put the only road vehicle that we could find on the ramp being loaded.

 

38478188900_c64a529e50_c.jpg

25416785917_2f1160abff_c.jpg

I'm sure there's a suitable photo caption there somewhere.....especially with the discovery of 'human' remains further up this page.

  • Like 1
Link to post
Share on other sites

  • 1 month later...

It has been a while since the last update so I thought that it was about time that I did one. Recently we had another one of our themed running nights and the theme was Pacific class locomotives, here are some pictures.

 

First 2 trains were hauled by Tornado and bittern.

41058179832_f4db64be6d_c.jpg

 

BR Standard Class 6 Clan Bucannan arrived with the next train

40206338245_e827d7eeb5_c.jpg

 

Br Standard Class 7 Britannia also made an appearance.

39291912150_b35e34af29_c.jpg

 

LMS Princess Royal Class Princess Arthur of Connaught arrived with the parcels.

39291912720_f5d6f7fc57_c.jpg

 

LMS Duchess Class Sir William A Stanier FRS is turned on the turntable

40206340185_bcc58f3921_c.jpg

 

SR Merchant Navy Class Channel Packet pulled into the station with its train

39292709640_3b88257df5_c.jpg

 

There was also an unusual freight train that arrived on the layout, this was the LNER cantilever set that has been scratch built by Tim, this consists of 5 wagons 2 Protrol B's (one at each end) 2 Flat Q's the next 2 wagons in form the ends (the ones with the cantilever armes on top) and the large well wagon in the centre is a Weltrol N the 2 cantilever arms attach to the weltrol N to enable it to carry heavier loads

 

40206337115_e8d4855e44_c.jpg

40206345235_da6e7e8359_c.jpg

 

There were also 2 other wagons attached to the back of the cantilever set the first being a Flat U which is a 8 axle flat wagon

 

40206343285_2ab7e65161_c.jpg

 

The other wagon being a Flatrol AA that can go in the cantilever set instead of the Weltrol N

 

40206342525_e8aa9e070c_c.jpg

 

The set of 7 wagons are almost 5ft long from 1 end to the other and haveof 48 axles or 96 wheels in total!

Edited by Northwick Group
  • Like 1
Link to post
Share on other sites

I'm trying my luck at a cake box challenge as one of my non Northwick projects, why not look in on my 'blog' about it and tell me what you think.

 

http://www.rmweb.co.uk/community/index.php?/topic/132913-put-your-back-into-it-lads/&do=findComment&comment=3112636

 

Hopefully it will be in a presentable condition in time for our Library event.

Edited by sbduck
Link to post
Share on other sites

  • 5 weeks later...

It has been a while since the last post, recently Northwick went to Twickenham Library for the annual event that Twickenham & district MRC and is aimed to showcase what the club gets up to. this year Northwick was set up in its entirety and was operating, here are some pictures.

 

27999532318_cf7cca3ccf_c.jpg

27999531948_cdaac92bfb_c.jpg

27999531718_3f225a024f_c.jpg

40969728075_f6da84a1b2_c.jpg

27999531388_175a509ac5_c.jpg

27999530918_d36fbccae2_c.jpg

40969726435_ff9b718306_c.jpg

27999530668_bf102c75b2_c.jpg

40969725615_9391b704f8_c.jpg

  • Like 3
Link to post
Share on other sites

  • 4 weeks later...

When's the 'layout rewire' going ahead. Hopefully not after your next exhibition outing!  :no:

Ah! would you be volunteering? :wink_mini:.

'I have a cunning plan', but like most of Baldrick's ideas, this one has got a few flaws which need ironing out. It's a bit more than a rewire as the PW dept will be doing some significant track alterations and we want to introduce a bit of route setting as well. Planning has started, last week in fact, 2000 feet up a Spanish mountain (well, there wasn't much else to do other than to meditate and monotonously recite Ohms law one hundred times before gin o' clock)

Cheers!

Link to post
Share on other sites

  • 1 month later...

As a long time Twickenham MRC member, I can remember the early days when this layout was first built and it was nowhere near the standard you see today. A few years ago a new team took over the project at a time when it was past its best and that new team have extended and refurbished the layout beyond the committee's wildest dreams.

 

Nowadays I visit the club very rarely and so I am looking forward to seeing this layout running at our club open day this Saturday, July 21st 10am to 4pm.

 

For full details of all the exciting things we'll have on show please visit our website www.tdmrc.org.uk 

Edited by TEAMYAKIMA
  • Like 1
Link to post
Share on other sites

Last Saturday Northwick was up and running at the clubs annual open day, if you came along we hope you enjoyed seeing the layout running and if you did not have the chance to come and see it then here are some pictures from the event.

 

29802596418_c1e482bccb_c.jpg

42956388254_6c6a321c4e_c.jpg

42769674185_63def4723d_c.jpg

42769674505_053e4a6dfd_c.jpg

42956389004_9ffe42d8de_c.jpg

29802599158_56e0cdc45a_c.jpg

28784170947_741bc9888c_c.jpg

42956390134_a97c8cb525_c.jpg

41864513180_597c869424_c.jpg

41864513290_bd4b6c636d_c.jpg

42956390514_26c167a565_c.jpg

43626227782_45452ac5b8_c.jpg

43629293742_1c644022ee_c.jpg

 

Even the archaeologists arrived in time for the open day

 

42956391154_2206b5d589_c.jpg

42956385974_4fc768c6c5_c.jpg

  • Like 2
Link to post
Share on other sites

  • 2 months later...

It has been a while since the last up date but we have been busy rectifying the issue that we have been having with the goods yard and that is that the surface has been continually lifting in places over the past couple of months so we decided that it was time to take the plunge and strip back the affected area right back to the base board and start again. 

 

The first step was to start excavating where the worst of the raised bits was and we soon discovered the cause of the problem and that was there was roof felt at the base which had become detached from the base board and so was causing the rest of the area to lift, you should be able to see the roof felt in the center of this picture.

31081279858_2f7996bf2e_c.jpg

 

So we then set about removing all of the areas that were loose ready to start again.

43141348320_6fef5bfda0_c.jpg

44954115041_37e2522a7c_c.jpg

 

once this had been done we then started the process of reconstructing the goods yard, the first step was to add a layer of the vermiculite, art mache, water and paint mixture that we used on the hill sections of the layout, this was done in 2 layers so as to allow each layer to fully dry before adding the next.

43141348230_a8e5426ae2_c.jpg

44041788755_70409727e9_c.jpg

 

Whilst the second layer was drying we took a low level picture to show how level it was.

44041786965_dec84f1894_c.jpg

 

When the second layer had dried we then sanded the mixture back so that it was level with the original surface.

44954115241_c9f7c1b3ae_c.jpg

44954114751_53dd3a1d31_c.jpg

 

As we needed to "cover up" the fact that we had been there we decided that we would take the opportunity to change the colour of the goods yard surface from a dark grey ash colour to a brown dirt with stones in it as after much consultation it was decided tht this would be the more prototypical surface for a goods yard, to achieve this we first painted the new section a mixture of browns and blacks for a base colour and once dry we applied PVA to the surface and created a mixture of soil, ash, coal, and various colour and grades of ballast to put over the PVA. here is how it looked whilst it was still drying.

44041790155_19ff520d27_c.jpg

30017142407_8664a6f704_c.jpg

30017142557_171ba0c508_c.jpg

  • Like 2
Link to post
Share on other sites

  • 1 month later...

Since the last update things have been moving quite quickly, first up is a picture of how the goods yard looked after the glue had dried and the excess hoovered off.

 

31799015798_2a8c4dbd23_c.jpg

 

The main focus of the group has now been to make a start on relaying the track work on board 3 which is the first step for the re-wiring of the layout which will also be started soon, this was first mentioned in post #42!

Since the last post we have been busy coming up with ideas on how to redesign the route which the locomotives take from their platforms to the turntable. We have decided to do this because at the moment it takes too long to turn the locomotives and it also causes bottlenecks within the goods yard because the locos currently use part of the goods yard on the route to the turntable. Below is a sequence of layout diagrams showing the route which the locomotives currently take once the train has arrived at the station and the loco has uncoupled and pulled forwards to the buffers.

1. The loco reverses from platform 2 to the shunt signal outside of the signal box

35569338161_0bfd32cc9e_c.jpg

2. The loco goes forward from the signal outside the signal box to the goods receiving road

35569338331_23f1465754_c.jpg

3. The loco reverses from the goods receiving road to the shunt signal in a goods pilot siding 

 34859057924_d808d19d51_c.jpg

4. The loco goes forward from the shunt signal in the good parts siding to the goods yard entrance

35312866290_266907bbc4_c.jpg

5. The loco reverses from the goods yard entrance to the turntable and gets turned.

35312911190_efb636b488_c.jpg

Below is a diagram of the current version that we are thinking of using the new track is highlighted in blue, the trackwork that is going to be removed is highlighted in red,  during the brainstorming session we decided it would be a good idea to create a new siding for the station pilot (highlighted in green) as this will stop potential bottlenecks being created in the bay platform as the station pilot is currently stored in the carriage siding that comes off of the bay platform (location circled in red), it will also be one less manoeuvre for the station pilot to pick up the carriages in the platform. 

 

35569338451_d64192261c_c.jpg

Here is a list of the points which are going to be used with corresponding numbers on the diagram.
1. Double slip - we are using this so that you still have access to all the platforms from the downline as well as the goods yard.
2. Asymmetrical three way point.
3. Right-handed A5 point.

This will result in a new shorter route for the locos to be turned whilst also keeping the operations within the goods yard and the engine yard separate. Below is a set of diagrams showing the new route that the locos will take to the turntable. 

1. The loco reverses from platform 2 to the shunt signal outside the signal box.

34859057824_fa616ba9e4_c.jpg

2. The loco goes forward from the shunt signal outside the signal box through the double slip and the three-way point to the engine yard entrance.

34859057874_91a0697f81_c.jpg

3. The loco reverses from the engine yard entrance to the turntable and gets turned.

35569338571_1afb3aa787_c.jpg

Please let us have your thoughts and ideas if we can improve this further.
 

 

Since then all of the points that would be required for this have been built by Tim & Steve B and can be seen in their positions in the picture below ready for the lines to be drawn around them so that we could make a start on removing the existing track work.

 

45671049341_fcfa885396_c.jpg

 

Removal of the existing track then started we decided to remove everything right back to the baseboard as we knew that we would come across roofing felt as underlay for the track which has caused us plenty of problems previously when we adjusted the track work and left the roofing felt in the past.

 

44946281354_f7694d16b8_c.jpg

30730371947_4f4c3bfed4_c.jpg

45671049021_6fcfc696c2_c.jpg

45671049011_f447c74664_c.jpg

45620440322_b02f6c0d9a_c.jpg

 

Once the existing track work was removed along with the roofing felt underneath it we placed the new points in their positions to make sure that everything was lining up like we intended it to.

 

45620440202_14f990755c_c.jpg

31798655918_28f2bce04d_c.jpg

30730371957_aa7350977f_c.jpg

44756766405_1888c5bd7a_c.jpg

44756766295_5476f87545_c.jpg

 

Whilst the permanent way department have possession of the track a  bus replacement service was implemented to ensure the passengers could still get to their destinations.

 

43852922310_56330362b6_c.jpg

30730371647_986827e405_c.jpg

30730371787_ae39906366_c.jpg

30730371517_27f498cf53_c.jpg

  • Like 3
Link to post
Share on other sites

  • 3 weeks later...

After all of the destruction the reconstruction has now started, the first part was to put down a layer of cork where the track will be going, we then soldered on the dropper wires to the points and tested them out one more time to ensure that the position of the points were correct before drilling the holes in the base board for the droppers. 

 

44188522830_e15292b098_c.jpg

44188522840_9a291b1839_c.jpg

44188522680_331a017cc7_c.jpg

44188522740_eb3646b872_c.jpg

 

once the points were in the right place we then made a start on making the straight section of track, we decided to make the straight parts of the track from the copper clad sleepers and rail in order to make use of what we had left over from making the points.

 

31065366757_fe9fda3bae_c.jpg

31065366827_f0e81a179b_c.jpg

45092894625_e197d784f0_c.jpg

45092894665_8155270c26_c.jpg

  • Like 1
Link to post
Share on other sites

  • 4 years later...

..... and then came the Pandemic.......

Subsequently it has taken a bit of time to get the layout going again, but rewiring is virtually complete with  a few snags being sorted on running nights.

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...