Jump to content
 
  • entries
    9
  • comments
    40
  • views
    1,849

About this blog

00 lockdown modelling on a budget!

Entries in this blog

2. Ballast off

Progress. I’ve started from the bridge end of the layout and roughly a third of the track is now stuck down, including 6 of the 8 points. I’m happy with my wire-in-tube point control, I’m waiting for some more glue gun sticks to tidy up around the slide witches. No idea why I didn’t group all the switches In this section together... hindsight is 20/20, but perhaps this will make them easier to disguise in amongst the foreground scenery.  Since there are no decouplers to be installed here (more o

GWL

GWL in Kingston Bridge

×
×
  • Create New...