Jump to content
 
  • entries
    46
  • comments
    43
  • views
    22,596

About this blog

Originally built as a Modern Image layout for the 2007 RMWeb Challenge . The blog now also covers my other layout (the Boxfile),  wild ideas for new layouts and general reflections...

Entries in this blog

"I can see clearly now the rain has gone..."

Things are looking up a bit for Mercia Wagon Repair, and the business seems to have escaped the liquidator's clutches.....   Two or three weeks ago I was feeling more than a little hopeless about the whole thing here , partly (if truth be known) for one or two reasons external to the layout. Although there were enough problems arising within the project to cause dispondency.   In the end after a certain amount of glum staring at N gauge points, I decided to see if  the second

Ravenser

Ravenser in Mercia Wagon Repair

Counsels of Despair

Things have not been going particularly well for Mercia Wagon Repair recently. As a result I've become rather disheartened and I've been wondering whether I should in fact pull the plug on the project.   Issue number one can be seen here:   A key point, buried fairly deep in the track plan has broken up at the tie bar.   This is the second point to break up at the tie bar out of 7 points I've bought so far (The first large radius point disintegrated at the tie

Ravenser

Ravenser in Mercia Wagon Repair

"Think Thrice, Measure Twice"

A fair amount of progress has been made with Mercia Wagon Repair over the last 6-8 weeks. However this has involved a number of revisions and minor tweaks.   The layout - or at least the "main line"  side of it , which was all that had been laid - had been test run  a few times. This amounted to running in a train behind a type 5, the loco running round and picking up a train of wagons waiting in the departure siding , then returning whence it came. The shunter would then shunt the inc

Ravenser

Ravenser in Mercia Wagon Repair

A Lot of Wiring For A Little Layout

The N gauge project is firmly analogue DC. This is because the core of the stock has been sitting in a drawer for nearly 15 years and none of the four locos concerned are "plug and play" DCC ready . Indeed the Farish 04 isn't DCC Ready at all and would be a real pig to convert. (I understand current production of the model will take a decoder)   Electrical wiring was long one of my blind spots. The wiring of Tramlink (Kent) consisted of a few bits of bell-wire and an on/off switch. Poi

Ravenser

Ravenser in Mercia Wagon Repair

Wagons Roll!

So - the wagon works layout project described here is now on. And very much as forshadowed in the subsequent comment.   Several things have pushed me into actually doing something. The first and most powerful is a problem that has developed with my right eye. Gloomy reflection suggested that if anything was to be done with the N gauge bits it had better be done quickly, whilst I was capable of it.    (I am glad to report that I saw the eye specialists yesterday, and they stat

Ravenser

Ravenser in Mercia Wagon Repair

Pardon My French - or Paint Your Wagon

I started a new job after Easter, and the big lockdown modelling push basically ran into the sands in May and June. But the sale of my late mother's house has now been completed;, and a long-overdue attempt to reduce the chaos of the study has taken place. Out went a large broken computer desk and the very old desktop it housed , and in came a small computer trolley; the office chair moved from the sitting room to the study, the study chair went in the bedroom, and a broken chair from the bedroo

Ravenser

Ravenser in Layout schemes

Gremlinology

In February I had the layout up after a couple of months and all was not well. Things stuck and stalled because they needed a thorough cleaning, the 128's body sat visibly too high, the NBL 21 needed a wheel adjustment, I was reminded that the NRX van needs one Kadee re-setting...   And most importantly, the point that leads into the fuelling point (and which forms part of one end of the run-round loop) stopped throwing . I tried adjusting the motor to release it with my fingers, tried

Ravenser

Ravenser in Electrical

"Which way shall I turn me?"

I have a new job, and (for the moment) most of the time I will be working from home. When I'm in the office I find myself within walking distance of the mortal remains of the Ipswich dock lines, several of whose locos feature on the Boxfile. The shops are open again. The sun shines and we see blue sky. I've had my first dose of a vaccine.    In the meantime, over the last year of lockdown, there has been time for reflection and clarification. The awkward fact is that I've made much les

Ravenser

Ravenser in Layout schemes

Postcards from the Layouts

As Blacklade is effectively completed, and so is the Boxfile there isn't too much to post in the way of layout construction these days. Lockdown efforts have mainly been focussed on sorting out the litter of unfinished stock projects - and if the truth be known, drifting into one or two more. And those things have gone onto my workbench blog..   However just to prove that the silence is not that of the grave, here are a few snapshots from when each of them was last up - "Pictures from

Ravenser

Ravenser in Operational

This Time I May Be Committed.....

I mentioned in a previous posting   Shifting Sands  that recent developments in RTR had tempted me to consider a possible 009 layout. Things have now moved on...   In the end, the Bachmann Baldwins proved rather too tempting to resist. I think the tipping point was when a little internet research revealed that 2'6" gauge was a de facto British military standard up to WW1, accounting for the Admiralty operations at Chattenden and Devonport and the RNAD explosives factories and depots. 9

Ravenser

Ravenser in Layout schemes

Skeleton in the Cupboard

A very long time ago, I went to one of the CMRA Workshop events. The bookseller was selling a copy of "Tramlink - Official Handbook" published by Capital Transport. (It was Geoff Gamble - I told you it was a long time ago)   Anyway I bought the thing, discovered that Alphagraphix were doing card kits of light rail units, and I got fired up with the idea of building one , and making a working model. This obviously would need somewhere to run, so the idea of building a small layout based

Ravenser

Ravenser in Tramlink

Messing Up Sydney Harbour

This is another of those speculative posts about possible layouts, so here goes....   Not so long ago someone posted a video to Clive Mortimore's layout thread that got a few people going - including me.   http://www.rmweb.co.uk/community/index.php?/topic/87205-sheffield-exchange-what-a-to-do/page-66   In short it was a rather eye-opening documentary film about operations at Darling Harbour Goods in Sydney in its dying days during the late 1970s. Backed up with anot

Ravenser

Ravenser in Layout schemes

Magpie's Nest

A couple of weeks ago I was meant to have someone round to see the layout . Unfortunately they went down sick on the day, Blacklade was up so I had a bit of a play - and things weren't running especially well. So I started fixing things and well...   In fairness I'm not sure the layout had been run more than once since Shenfield last September. My attention has been fixed on sorting out the Boxfile for the 4 months. If you don't use things it shows, so action had to be taken. I bought a rollin

Ravenser

Ravenser

Shifting Sands

This is by way of a speculative post.....I've remarked before that it's been a very long time since I started a new project. Over a decade in fact. Between 2000 and 2007 I launched into 4 different layout projects, all 4mm/OO - Tramlink, a club layout project, the Boxfile, and Blacklade - but since then, nothing.   I've recently resurrected the Boxfile - see postings here - and though I'm still hunting gremlins in the stockbox it's working a whole lot better than ever before. Proper sy

Ravenser

Ravenser in Layout schemes

Served Up On A Tray - Dessert

We left the Boxfile last time safely installed on its new tea-tray, but with the track joints still to patch, and scenery to touch up.   The track joints were not at all good - they never have been. In the worst place I think there was a horrifying 4mm long gap in the railhead.   The solution was a bodge I've used in one or two places on Blacklade, though not on quite such a scale. This is to cut a sliver of 40 thou plasticard and superglue it in place in the gap. Once the

Ravenser

Ravenser in Boxfile

Served Up On A Tray - Main Course

The deed is done - or at least most of it. On Saturday I duly trotted off to the local DIY sheds. Unfortunately Wickes and B&Q locally do not cut timber , and Buildbase - who might - were closed. But a sheet of 5mm ply in B&Q was only £5.47, so I bought it anyway.   Having got it home and marked out the cutting plan I discovered that if you heavily score the desired cutting line on both sides with a Stanley knife you can snap 5mm ply along the line much as you would do 40 thou

Ravenser

Ravenser in Boxfile

Served Up On A Tray

This is by way of a short "statement of concept" note.   The Boxfile (formally Whitefriargate Goods) has been out of commission for a couple of years, after the end of the fiddle yard track became damaged. At one level this simply means a basic and fairly straightforward repair. But it has thrown into sharper relief the main problem with this layout.     That's the board joint. The two files are currently held together - when assembled - by fishplates connecting th

Ravenser

Ravenser in Boxfile

Layout Operation - Some Definitions

This arises from the recent thread on Ally Pally.   Blacklade's modest experiences at the show are matter for another post, but one aspect of the post-show discussion was the claim by several people that many or most of the layouts were not running trains, and somewhere [probably at post 358] the idea arose that this was because the layouts and their operators were using timetables or sequences or something of that kind.   As will be evident from the subsequent discussion htt

Ravenser

Ravenser in Operational

I'm Not Committed to Building This, You Understand - Mark 2

It's been a very long time since I last started a layout project. For the last few years I've been stubbornly trying to get on top of the long, long list of stock projects for Blacklade, and the nearest thing to a new venture was the decision about 3 or 4 years ago to sort out my stray bits and pieces of steam stock, fill in the gaps, and try to have a "funny trains" steam period nominally set in 1958 . That inevitably resulted in me buying cheap new projects as fast as I cleared existing projec

Ravenser

Ravenser in Layout schemes

Decoders: "Walk thrice round the room widdershins and don't think on a fox tail"

[What with a new job and sundry other distractions I've been pretty quiet on here for a while, though a certain amount of modelling has taken place. This entry has been sitting unfinished in draft status for some months - rather than delete the thing I've finally tidied it up and released it into the world out of its time slip....]   I had the layout up and the result was a bout of decoder fitting and test running. And I'm beginning to see why some folk view DCC as black magic.   Four locos

Ravenser

Ravenser

Railway Modelling without Modelling

I've been pretty busy on the hobby front in the last few weeks. The trouble is that it hasn't involved making any models....   A few weeks back I was helping with the DOGA stand at a show in the Midlands, which meant a couple of days away. Very nice and hopefully productive, some nice layouts , and I was a good boy on the spending front.   Then the following day someone from one of the magazines came over to photograph the layout for an article, which will (I hope) appear in the next few mon

Ravenser

Ravenser

First Night Nerves

The layout has been to its first show. We survived. (Actually it went quite well.)   Some years ago I was involved with a rather unhappy club project. That layout's career culminated in a disastrous trip to a show as a part built item. Some of us in the group had hoped that this would mark a turning point in the project and that we could put on a good show for the public to re-establish some credibility. Unfortunately that was not to be, as someone who technically was not part of the g

Ravenser

Ravenser in Reflections

Electrifying

More of a brief note but - in between other distractions the layout has been up and run, and while it was out, I took the opportunity to sort out some outstanding electrical business   The NCE PowerCab does not seem to have full short-circuit protection. I'm not sure of the technical details but I've finally installed some additional protection. This takes the form of a cheap and basic circuit breaker from Halfords, price £1.70 or so. http://www.maplin.co.uk/p/10a-auto-reset-circuit-breaker-a

Ravenser

Ravenser

Multiple, as in Diesel Multiple Unit

The obvious thing to be done when you have a new model is to run the layout... So the 101 was given a thorough workout during a running session, just to make sure there were no hidden bugs   :   Tail traffic is an operational feature of the layout - the CCT will be attached to the outward working of the morning parcels. Hence DMUs need functional couplings. This gets in the way of full end detail, and I'm toying with the idea of giving the 114 fully detailed ends to use the Craftsman pack I

Ravenser

Ravenser

Bits and Pieces

I've had the layout up for a few days, and as well as a couple of operating sessions, I've taken the opportunity to sort out various jobs , as someone is slated to come and see it...   The big one is that at long last the station building has been finished off, with an end, back wall and door, and the "bomb damage" is no more. Quite deliberately the effect is that a section has been taken through the building - rather than paint the back wall black , I used some Superquick red brickpaper - thi

Ravenser

Ravenser


×
×
  • Create New...