Jump to content
 
  • entries
    58
  • comments
    24
  • views
    8,321

About this blog

Started in 2004, this layout was originally an end to end with a run-round loop and a bay platform. It now forms part of double track layout. I built it in the early days when I hadn't really taken into account moving it about so its 2m long and about 630mm wide. However it has been moved about 5 times from house to house. It started as an analog layout and then was converted to DCC, then lots of wires for everything were added but in 2020 I discovered MERG and CBUS so its be re-wired again which has simplfied the underboard somewhat. The original layout consists of baseboard 1. But following another move I am now adding about 12 new baseboards to it plus a rear upper deck

 

Layout is in an insulated loft ontop of kitchen base units for storage.

 

Its not prototypical but wouldn't look out of place for a somewhere place for somewhere in the GWR / Midland territory. The station on baseboard 1 does have Great Central influences as is scratchbuilt. I like running GWR/ LMS / LNER and BR Standard steam locomotives, plus early diesels so its the early 1960s on the lower deck. The top deck is intended to be 1960s to 1990s but will retain semaphore signalling. It could also be a double track heritage railway......

Entries in this blog

A return to the lower deck - part 3

First semaphore signal installed and working.   2x front crossover points all wired up and working, have installed microswitches for frog polarity.   Now I know the wiring configuration the rest should be straight forward enough although I need to build a daughter board for the CANMIO to enable 16 outputs for the servos.   When I took the photo of the signal I had power to it but had wired the relay up wrong so that it wasn't moving but it is now. - (Its a CANPAN, t

MattB

MattB in Layout Wiring

Trains running for first time in months

Back in May 2019 I packed the layout away expecting it to be up and running again in about 12 months. Here we are over 2 years later and it's finally installed and working. A big pat on the back for me. It's being a crazy year what with house structural problems and other personal matters to deal with   Here we are then. This board now in its 17th year and 4th home has been rewired with new merg cbus electronics soon to be installed. I've added a narrow board for the new analog upper l

MattB

MattB in Layout Wiring

Rewiring baseboard 1

With the test rig now finally working and doing what it is supposed to be doing I decided to return to the re-wiring yet again of the Mattington layout. Baseboard 1 originally built in 2004, I think this is the fourth attempt I have had at re-wiring it but this time I hope it will be the last. Am installing a CBUS layout control bus alongside the DCC bus but I am re-wiring both of them and adding several more drop downs for the DCC bus as well as wiring in the polarity switches directly into the

MattB

MattB in Layout Wiring

×
×
  • Create New...