Jump to content
 
  • entries
    58
  • comments
    24
  • views
    8,375

About this blog

Started in 2004, this layout was originally an end to end with a run-round loop and a bay platform. It now forms part of double track layout. I built it in the early days when I hadn't really taken into account moving it about so its 2m long and about 630mm wide. However it has been moved about 5 times from house to house. It started as an analog layout and then was converted to DCC, then lots of wires for everything were added but in 2020 I discovered MERG and CBUS so its be re-wired again which has simplfied the underboard somewhat. The original layout consists of baseboard 1. But following another move I am now adding about 12 new baseboards to it plus a rear upper deck

 

Layout is in an insulated loft ontop of kitchen base units for storage.

 

Its not prototypical but wouldn't look out of place for a somewhere place for somewhere in the GWR / Midland territory. The station on baseboard 1 does have Great Central influences as is scratchbuilt. I like running GWR/ LMS / LNER and BR Standard steam locomotives, plus early diesels so its the early 1960s on the lower deck. The top deck is intended to be 1960s to 1990s but will retain semaphore signalling. It could also be a double track heritage railway......

Entries in this blog

Points and Track

I have started working on the trackwork on the top deck. I had already laid track 1 which is at the rear and added in the points ready for the rest of the trackwork on this deck. I have now extended track 2 to a loop and started work on track 3   The idea of this deck is for it not to be prototypical but to be more of a tail chaser with a heritage line bolted onto the front of it. That way I can run items that are of a different era (and my older Lima stock) and I hope the height diffe

MattB

MattB in Trackwork

×
×
  • Create New...