Jump to content
 
  • entries
    13
  • comments
    25
  • views
    15,092

Sleepless night means getting the plotting bug...


Flyingscotsmanfan

1,068 views

So... as the title suggests I am having a bit of a sleepless night, various things on my mind means that I need something to try and relax me... so I set up Ffarquhar and placed a rough print out of the trackplan down. There is something magical about placing the trackplan down on a fresh baseboard for the first time and this time was no different but it didn't stop there, soon I was placing Locos and Rolling stock to get a feel for the layout:

 

IMG_0267_zpsee864ffd.jpg

 

IMG_0268_zps8d9f705c.jpg

 

IMG_0269_zps3a1d1351.jpg

 

IMG_0271_zpsa52b46ba.jpg

 

IMG_0272_zps8843a3a5.jpg

 

I have also tested just how much I can get in the platform area and found I can fit two longer bogie coaches and still have room to go round the run around loop, so I can also run Edward, Donald, Douglas and Emily which means more operation potential... even though it isn't prototypical... Then again there is rule no. 1 ;)

 

Until next time...

  • Like 2

4 Comments


Recommended Comments

They are the American Bachmann models, but I modify them slighty, Toby for instance has has his Cab doors and windows opened up and his cowcatchers cut to make them see through. All my models get the 3 link/screw link coupling treatment too. I will go into more detail in a blog entry soon :)

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...