Jump to content
 
  • entries
    13
  • comments
    25
  • views
    15,094

A Quick Update


Flyingscotsmanfan

1,200 views

As I have access to a proper computer for an hour or two I am utilising the time to bring you a quick update on Ffarquhar.

 

First up is that have now attached the Control Panel to the layout, which is bolted on and secured with wing nuts, this is so I can take it off after a running/working session and for transportation/storage.

 

IMG_0315_zps52237223.jpg

 

I have also given the track a preliminary coat of Railmatch Sleeper Grime which does take away the "Toy Train" look of Peco track, the least enjoyable bit was painting the doubleslip. I had to make sure that I didn't get any paint anywhere where it can act as an insulator... Tests after the paint had dried showed that I wasn't entirely successful but after cleaning the affected areas, it runs once more.

 

IMG_0314_zps6005bc60.jpg

 

As can be seen from pictures I have started to build the platform which is made from strips of thick card that I managed to obtain from the local supermarket where I happen to work. The Platform face was then laminated with embossed brick plasticard and painted to match the station building.

 

IMG_0308_zpsb2d2c124.jpg

 

IMG_0312_zpsddecd484.jpg

 

IMG_0309_zps516d996d.jpg

 

That's all for now, As I have the rest of the week off I shall hopefully be ballasting until next time here is a picture of Thomas waiting at Ffarquhar Station

 

IMG_0311_zps16e81f0a.jpg

  • Like 2

0 Comments


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...