Trefeglwvs Road Cambrian Railways 18
Hi
I finally been able to work on the layout again. I have relayed the track over one of the baseboard joints, see below. The mainline has been relayed in code 100 track, because the cassette sits better on it, than on code 75 track. I've been experimenting with various supports for the cassette to ensure alignment and good electrical connection.
I have also decided to add a dedicated programming track, see below.
The next task is to relay the track over the other joint, and then to wire the fiddeyard properly, including a plug in connection from the controller, making sure that the wiring is fixed down to the bottom of the baseboard.
Julie
PS I'm having problem uploading pictures, because of slow internet speeds.
- 2
0 Comments
Recommended Comments
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now