Track laying continues, but progress is quite slow. I thought plain track would be quite easy, and I suppose it is technically, but it still takes an age. Progress is not really helped by my attempt to replicate the 60 ft and 30 ft track panels used on the real thing. It appears that only the main platform road was 60 ft, all the other being 30 ft. To achieve this, all the sleeper ties on the flexi-track have to be removed and sleepers moved along to the correct spacings. I've already marked the position of the rail joints as near as possible from the Templot track plan. All this cutting and sleeper moving takes time. Then there's a limit how many jar-weights I have to hold the track down whilst the glue dries and there's the ply sleepers with panel pins to be soldered at the board edges......
Anyway, I've now got most of the track in position on the station throat board - just the loop head shunt left to do. Meanwhile, a Delph motor train arrived, hauled by the Fowler Cl 3 2-6-2 tank and consisting of M45 driving trailer M3419M and M12 non-driving trailer M3425M - both beautifully modelled by Coachman. Thanks Coach!!
Overall view of the station throat track-work. Lead filled jam jars on the coal drop road whilst glue dries.
A taste of things to come. Typical 1950's motor train crosses the curved diamond which gives access to the mill siding.
Dave.
2 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now