Jump to content
 
  • entries
    15
  • comments
    67
  • views
    17,900

Concrete Progress & 08 Conversion


Kaolin2FS

1,310 views

Here goes nothing - it is a test layout, after all! Before and after shots of the P-Way following a visit from the concrete pouring gang: :O

Before...

blogentry-16846-0-68731000-1393796318_thumb.jpg

After...

blogentry-16846-0-38155500-1393796278_thumb.jpg

Once dry, the filler will be sanded until the rails are slightly proud of the surrounding concrete (I sanded the tops of the rails level beforehand) and then the flange recess on the inside of the rails gently scraped clear. Clearly, I've left the pointwork for the next batch of concrete after I've see how the rest of the job has turned out!

 

On the rolling stock side, I've now got the 37, 150 and 153 all happily converted and running over the layout without issue, so I've had a go at converting my old Farish 08 to 2FS and DCC. This is a stopgap until I've got a new Bachman 08 bodyshell and have purchased the parts for and built a 2FS chassis - some way off yet. I purchased a TCS Z2 decoder which nicely fits inside one half of the cab, although the running is a little jerky still which I think is probably due to my dodgy soldering rather than any CV values (the re-profiled wheels and track are spotless) although any other ideas gratefully received!

 

Decoder added

blogentry-16846-0-32735500-1393796256_thumb.jpg

Fitting neatly inside the cab

blogentry-16846-0-81007700-1393796265_thumb.jpg

And afterwards, with re-profiled 2FS wheels added

blogentry-16846-0-78858300-1393796119_thumb.jpg

blogentry-16846-0-57674200-1393796125_thumb.jpg

 

More on how that concrete turned out later in the week!

Graham

  • Like 6

5 Comments


Recommended Comments

Nice work Graham and I have a Farish 08 that I want to convert and this is the impetus I needed just have to get decoder from Ally Pally

Link to comment

That looks a lot of work to clean up now!!  I think I'd have run a bit of plasticard or something against the rails to clear some of the "concrete" before it set :-)

Link to comment
  • RMweb Gold

Some of us have done it and thrown the track away 3 times :D

 

As you say, its a test so good luck with it and let us have an update when the dust has cleared... ;)

Link to comment

Nice work Graham and I have a Farish 08 that I want to convert and this is the impetus I needed just have to get decoder from Ally Pally

Do it... The only thing I'd say is, next time I'll see if there's room for a small stay-alive as well as it is rather liable to come to a grinding halt with the tiniest of excuses! Sadly not able to make it to Ally Pally this year... Always a good show

That looks a lot of work to clean up now!!  I think I'd have run a bit of plasticard or something against the rails to clear some of the "concrete" before it set :-)

Ian, I did try that last time but due to 'shrinkage' I then needed to go back over with a second coat - this time I made it thicker which helped and I did use your method for the second 'pour' which worked well, thanks

Very brave, let us know how it goes, I tried this once and the cleanup meant I threw the track away

Some of us have done it and thrown the track away 3 times :D

As you say, its a test so good luck with it and let us have an update when the dust has cleared... ;)

Well it appears to be working at present... see latest update!
Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...