Spent a pleasant hour or three doing the basic Templot plan for Balcombe station yesterday, using the 1910 25-inch OS map as an underlying picture shape together with some photos in the 1950s to modify some of the detail/errors in the map and changes due to the subsequent elapsed time - notably the change in position of the trailing crossover between the two main lines from the platform area to north of the entrance to the down refuge siding.

 

FB on the main line (thanks to Martin Wynne for pointing me at the correct switch option smile.gif ) - nice D12 crossover! - and BH in the yard.

 

Will probably leave the detailed tweaking until we get the available photos from Lens of Sutton.

 

blogentry-6669-12590673704111_thumb.jpg

 

At full size this bit alone is about 9m long - but we should be able to compress it a bit by reducing the length of the two refuge sidings.

1 Comment


Recommended Comments

Say No to compresion!biggrin.gif

 

although I have to say that it looks as if it could be a mighty impressive piece of work. with the viaduct as well.

 

regards

trebor

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...