A bit more work on the roof
As the roof grows the structure stiffens up (thankfully)I have enough roof pannels to complete 3 out of the 5 tripple spans. I have also started the capping on both the roof tops and brickwork over the entrances. I will carry on with the foofs until I use up the pannels. I will then order some more along woth some 1mm microstrip to make the north lights with.
I will fit again the barge boards to hide the join where the roof meets the walls. Before fitting the downpipes I will see if a brick pelmet looks any good at the bottom of the walls. I will need to build the chimneys/ smoke jacks. I will try the ones in the kit to see what they look like
I will also try and contact Wills to see if they will sell me some extra sprues for the capping and the smoke jacks if they have the look I am after, I have the capping they sell with the chimney/roof packs and will see if it matches first.
I am still wondering about the inspection pits, I guess in the end I will put them in but it will be a pain cutting through the 9mm MDF. I will use brick sheets at each entrance for the floor covering, however as it will be dark inside the shed I will use plain plasticard further in then blend the two together.
2 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now