Jump to content
 
  • entries
    34
  • comments
    37
  • views
    13,493

Re-work and re-plan. Much better I hope you will agree :)


danstercivicman

497 views

blog-0479690001420375584.jpgWell.... I have sold all my WR stock (except the Paviland Grange) I have been very busy over the holidays (amongst work etc and family time). I am concentrating on the LMR around 1963. No branch lines. The layout starts with a double track terminus, this goes into a tunnel then there is a small station where the MPD is located. This flows into another tunnel into a curved junction where the third terminus departs and the mainline curves round into a hidden set of sidings.

 

All in all this should give great operating flexibility and allow me to exploit 7 coach mainline trains!!

 

I have also sold most of my set track and am now using Peco SL 100 and flex track (much better) the curves are all (with the exception of the tight station junction) at least radius 6/7 and the de-railements at junctions have ceased!!! Long live PECO SL 100!

 

Also I have changed the Bachmann brass wheels on the Dapol Period 3 coaches for Hornby metal wheels and they glide along!!!

 

I am glad that I did not start ballasting as it has allowed me to test and develop the plans. I am getting some more wood and flex track this week so maybe in a few weeks another update. It is truly a blessing having so much space!!!

 

Enjoy the pics :)

  • Like 7

1 Comment


Recommended Comments

You seem to be anticipating a lot of fun with this reworking - I hope everything goes, literally, acccording to plan.  Enjoy all those long trains in all that space!

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...