Jump to content
 
  • entries
    3
  • comments
    2
  • views
    1,081

GWR 1308 Lady Margaret in O Gauge


brian335

801 views

A series of notes following the build of an N Brass Locomotives kit of Lady Margaret, GWR 1308

 

Having partially realised what I was letting myself in for after starting on Pembroke Castle, I decided to look around for something simpler. I saw this kit at the Peterborough show last year and after (almost) finishing a BR Mark 1, building an axle alignment jig and treating myself to a resistance soldering unit, I decided I was good to go.

 

The kit is superb and any faults in construction are entirely mine. The side frames went together perfectly and are show here with the main bearings in place. All the bearings were the same size and the instructions indicated that the leading wheels should have about a millimetre vertical play and should be sleeved to cater for the smaller axle. I decided that it would be better to make my own bearings to fit and these appear in later photos.

 

IMG 5918

IMG 5917

  • Like 4

2 Comments


Recommended Comments

Gradually getting these photos uploaded. Here's the smoke box and boiler being trial fitted. Fortunately for me, this kit comes with a pre-rolled boiler.

IMG 5920

Link to comment

Finally caught up on the photos upload. The latest of these is all the bits drying out on the radiator following a good scrub down with lashings of hot water and The Barkeepers Friend.

IMG 6106

Part of the reason for doing this is that the next bit to be stuck on is the smoke box after which it will be virtually impossible to access the inside of the smoke box ever again and I want to be sure everything is bright and shiny.

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...