Epsom Show
The show at Epsom went well. (Thanks to Justin and Mark for their time operating etc). The new MERG Shuttle work well enough, although the deceleration/delay times could be longer. This may need either a reset chip or adjustment to resistor /capacitors.
The Platform siding rails at the board joint took a bash loading into the car - although repaired a bit they will need relaying.
Valentin brought along his new C Class which runs as well as it looks.
The operating schedule didn't last long- too complex- I understood it , but no-one else could so rethought required there I think.
There was a microswitch failure two days before the show that would have stopped everything, so temporary measures were taken to rectify this and they worked well over the two days, but the operating linkages are getting a bit slack after 30 years so a review of these will be needed, with a program of TOU replacement.
R
- 8
4 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now