Jump to content
 
  • entries
    47
  • comments
    82
  • views
    15,967

Clovelly Road - Couplings & Curves 2


I have now soldered the connections from the socket on the back edge of baseboard 2 to the power bus and linked the new track which links the scenic section to the fiddleyard, see photograph below.

 

Before power was connected the wiring was checked out using the buzzer feature of my multimeter, to make sure that no shorts exist between North – black and South – red.

 

blogentry-0-0-17023900-1446259868.jpg

 

I have now solved the problem of getting the guards van around the fiddleyard curve without it derailing. The solution was to improve the flexibility of the coupling. The previous chassis was produced by doing a cut and shut on the original Farish chassis. I have now replaced it with a 15 foot Peco chassis, which has been reduced in length using cut and shut to 10 foot length.

 

The first photograph shows the train approaching the fiddleyard curve and the second shows the train about to leave it.

 

blogentry-0-0-40626400-1446259556.jpg

 

blogentry-0-0-76495000-1446259565.jpg

 

Julie

1 Comment


Recommended Comments

Steam_Julie

Posted

This is real relief to get the train to be able to negotiate the fiddleyard curve without a derailment!

 

Previously the couplings on the brake van were fixed and I was depending on the reduced length to enable the van to negotiate the curve. This reduced the drag as it went around the curve.

 

Julie

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...