When the track was laid a paper template was made by placing a sheet of paper over the track, using the outer rail and a pencil a line was drawn. Then the process was repeated for the baseboard edge. The template was then cut out and checked against the track and baseboard edge. After several iterations, it was used to cutout the platform base.

 

The photograph below shows the site of the platform at Clovelly Road, just before the overbridge on the Hallwill Junction side.

 

blogentry-20065-0-50071100-1455905573.jpg

 

Below is the photograph showing the basic construction of the platform. The strip along the inner radius top will eventually form the basis of the coping stones, when the individual stones are scribed onto it's surface.

 

blogentry-20065-0-66797400-1455905802.jpg

 

This photograph shows the platform placed in position, on the mounting blocks.

 

blogentry-20065-0-82506600-1455906514.jpg

 

The view below shows the platform with the width of the end section trimmed. This was done on the prototype to save money, as the company was in financial difficulty.

 

blogentry-20065-0-44045700-1455906692.jpg

 

This view shows the platform mounting blocks trimmed and glued in position.

 

blogentry-20065-0-93945700-1455907060.jpg

 

This next photograph shows the platform glued in position. It took many iterations of trying to run the train through. Then marking where it hit the platform. Then removing excess material, using a scalpel as a plane, before the train ran smooth through, without any hesitation.

 

blogentry-20065-0-59689500-1455907365.jpg

 

The view below shows the relationship between train and platform, when the above process was complete.

 

blogentry-20065-0-48533100-1455910541.jpg

 

The attached thumbnails are views of the primitive waiting shelter provided for passengers at Clovelly Road. Since the prevailing weather is from behind the shelter, it worked well.

 

blogentry-20065-0-35790500-1455910437.jpg

 

blogentry-20065-0-59216200-1455910465.jpg

 

blogentry-20065-0-75319600-1455910482.jpg

 

Below is a photograph of my best friend, who kept me going through my recent problems with a rough cyclist. See is siting on the floor of one of our local buses.

 

blogentry-20065-0-99057000-1455907938.jpg

 

Julie

5 Comments


Recommended Comments

I think you need some 'Mind the Gap' signs for passengers on the sharply curved platform!  It's good to see that they have protection from the 'horizontal' rain in those parts :)

 

Mike

Link to comment

There were 2 sets of platform steps, which were moved to where required by the guard. Doors were locked, when passengers had boarded, to prevent accidents.

Julie

Link to comment

On platform 3 @ Clapham Junction, on the reverse curve there is a larger gap! when boarding or alighting from a suburban train.

Julie

Link to comment

The drop when alighting or boarding a train @ Cromford on the Derby to Matlock line is larger than the drop at Clovelly Road.

Julie

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...