Steam_Julie

503 views

The more observant amoungst you will have realised that I use Anyrail to do my basic design and Trax 3 to produce the point templates. I've used the package that's best for the task in progress.

 

The first two photographs are the template sheets that I will cut up and attach to my work board to construct the actual points, more correctly called turnouts.

 

blogentry-20065-0-20716900-1478716855_thumb.jpg

 

blogentry-20065-0-24092300-1478716867_thumb.jpg

 

The photograph below, is of a sheet laid out to check that the proposed handing of the points would work to produce the desired track layout. It was a very useful process and I discovered my initial thoughts were incorrect. Better to discover a mistake at this point than after point construction is complete!

 

blogentry-20065-0-27802700-1478716881_thumb.jpg

 

I'm going to leave the decision about the exact length of the loop until track laying stage. This is because I'm going to adjust the distance between tracks to a minimum, to give the layout a more spacious feel.

 

I hopefully will have the time to start construction next week. My eyesight is now getting back to normal, following my operation.

 

Julie

  • Like 1

1 Comment


Recommended Comments

It should be notes that, you have to add an extra sleeper or two at the switch end of the point to be able to make a viable point. I.e. you can't have the tiebar on the end of a point. The tiebar replaces the stretcher bars on the prototype.

 

Julie

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...