Trench Sidings Attempted Tracklaying
The pointwork for the layout was made by Tony Wilkins some time ago but everything went on hold as I built a new garage.
The main section of pointwork was made in one peice and I have attemted to lay this, first soldering on wire droppers (tinned coper wire) but have now hit a problem. There are so many droppers that I cant find a way to get them all into the holes I have drilled in the baseboard!
The first photo is of the pointwork before I added the droppers.
The second photo is the underside with the droppers added.
The suggestion is that I solder on some flexible wire onto the end of the stiff droppers, so that will be the next job.
- 2
1 Comment
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now