Preparing for Missenden
It's less than two weeks to go before the Missenden Abbey Spring Railway Modellers weekend. This year, in a break from tradition I am booked on the painting and lining course with Ian Rathbone. My chance to learn to finish my models from probably the best around. Although rather daunting I am looking forward to hopefully gaining some new skills. To this end I thought I should try to finish a few items to the state that I can try to paint them at Missenden, time allowing.
My Black Hawthorn was already finished, or so I thought until I decided to clean it up ready for primer. It was then I notice I had failed to add the two T handle from the valves on the dome. So I drilled through the cab front and added these out of some bits of 0.45 brass wire.
Next on my list was the Neilson, that I knew needed some more work to complete the cab detail, break gear and under frame. So I spent the last evening or so working on the cab detailing, I decided the under frame could wait, it was the body the I was more interested in painting. I believe that I now have the Neilson complete above the footplate. It needs the brake gear to the rear to be added, the clack valves below the footplate and some taps on the cylinder fronts.
Next on my list of items to add those finishing touches to are my NuCast steam rail motor and the Duke.
The steam rail motor needs some steps made up to replace the broken, and frankly not very convincing white metal ones. The real thing had complex folding steps on the passenger doorways to allow passengers on and off at locations without platforms. The white metal versions in the kit, which have since broken, where very simple and not a good representation of the original. There were also steps on the buffer beams to allow the crew to change the lamps etc. The kit makes no provision for these, but I am hoping I can adapt some etches intended for guards vans to represent these. The roof needs fair bit of cleaning up, but this could be done later, since the main body could be painted without the roof.
The Duke needs a top feed, clack boxes, smokebox dart, lamp irons, cab interior fittings, whistles and handrails. The later being a bit of a pain since there are no handrail knobs positions marked on the kit. I also need to replace the middle step tread on the rear tender steps, sadly I was attaching it with the RSU and sneezed, the result was that the delicate half etched tread pretty much vaporised. Something I will have to learn to avoid in the future.
Hopefully I will have time to get all these things sorted before Missenden. Then I need to think about priming all or some of them so that I can apply top coat at Missenden. Perhaps I should have started my preparations somewhat earlier!
- 4
5 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now