Jump to content
 
  • entries
    34
  • comments
    48
  • views
    11,193

Test track baseboard setup pt2


Harlequin

579 views

I did a better job of fixing the pattern maker's dowels with the next baseboard connection. Practice makes perfect.
This time, I drilled a small pilot hole through both baseboard frames while they were clamped together. (There was only just room to get my small Makita drill in to do this - something to maybe plan better in future!)
Thus, when the frames were unclamped the pilot holes were exactly aligned where the faces meet. Then, using these pilot holes, I was careful to hold the drill perpendicular to the face while I used the forstner bit to drill out the pockets for the dowels.
blogentry-32492-0-43536800-1530957695_thumb.jpg
Much neater!

 

Since the pockets were more accurate I went ahead and screwed the pattern maker's dowels tightly into the pockets and offered the boards up to each other. Clunk! Perfect fit and alignment is acceptable.
blogentry-32492-0-19955000-1530957926_thumb.jpg
blogentry-32492-0-42550200-1530958219_thumb.jpg

 

So I now have the three main frames joined and bolted together on the trestles.
blogentry-32492-0-53827600-1530958935_thumb.jpg

 

Next job: Construct the twin track bridging section to span between the horns of the "U". It will be an H cross-section of 9mm ply with 78mm deep cross-bracing below the track bed. The taller sides provided by the H should prevent the 1440mm long bridge from sagging in the middle.

  • Like 2

0 Comments


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...