Bodmin General(ish) Station building starts 3
The rear of the station wall is next up, on the left the selection of wall pieces from the kits available/suitable. On the right the pieces have been trimmed so they all but up together
The rear of the station wall after being stuck together. I have altered the left hand end gabel from a large window to a slit window, a bit of filler and paint should hide the join
On the left the station forecourt elevation with the revised left hand gable end, I decided not to alter either the center section or right hand gable end. The doors line up with each other in the centre section, adding a second window would mean them being too close to each other ,the door and the wall end. As for the right hand gable, adding a second door would have caused issues with the door frames and as they will not be seenI will not bother
The station roughly placed into position, its in approximately where it is on the plan, but the canopy will dictate the final positioning. I will follow the instructions regarding painting the walls, window frames and doors before fitting them
I am now letting everything dry out completely before I get out both the filler and primer. Next up I need to start one of the platform canopies, this will allow me to see how they will fit into the scheme of things
- 4
0 Comments
Recommended Comments
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now